Search site

Road Watch

The Council has an annual approved programme of work for both principal and non-principal roads.

Current road works around the Borough

There are also many minor and medium sized works, including carriageway potholes, patches and small footway repairs, which are carried out on an on-going reactive basis, which includes gully cleaning and street lighting maintenance.

For further information on Highway Maintenance, please refer to the related link on the right hand side of this page, 'road and footway maintenance'.

Related links

In the right hand menu we have provided links to show where major works are in progress, please note these maps are provided by Google Maps and the Council is not responsible for their content. The arrow on each map highlights the road and not the precise location of the works.

Also contained within the right hand menu is a link to the Electronic Local Government Information Network (ELGIN). This link provides information on road works that are being undertaken by Utility Companies. The site is not operated by the London Borough of Bexley and therefore has no control over its content.

Principal road maintenance

2013 - 2014 Footway / Carriageway Schemes

  • Station Road, Sidcup (Manor Road to Railway Bridge) - Carriageway resurfacing in progress (Night works).
  • Days Lane, Sidcup (junction with Fen Grove) - Carriageway repairs to be undertaken 5 August 2013.
  • Parkview Road/Crook Log, Bexleyheath - Carriageway repairs to be undertaken. Date to be advised.
  • Danson Underpass/Lodge Lane, Bexleyheath - Footway repairs and Carriageway resurfacing to be undertaken commencing10 June 2013.

Non-principal road maintenance

2013 - 2014 Footway Programme

  • Arbuthnot Lane, Bexley (Bridgen Road to Bridge over A2) - Footway reconstruction to be undertaken commencing 15 July 2013.
  • Bedens Road, Sidcup (No.17 to Ellenborough Road) - Footway reconstruction completed 3 May 2013. Phase 2 to commence 9 September 2013.
  • Cray Road, BelvedereFootway reconstruction to be undertaken commencing 28 June 2013.
  • Glengall Road, Bexleyheath (Stratton Road to Station Road) - Footway reconstruction to be undertaken commencing 19 July 2013.
  • Hook Lane, Welling (Danson Crescent to Churchfield Road) - Footway reconstruction to be undertaken commencing 4 October 2013.
  • Manor Way, Bexley - Footway reconstruction to be undertaken commencing 2 September 2013.
  • Mayplace Road East, Bexleyheath (Pinnacle Hill North to Barnehurst Road) - Footway reconstruction to be undertaken commencing 19 June 2013.
  • Mount Road, Bexleyheath - Footway reconstruction to be undertaken commencing 4 November 2013.
  • Old Road, Crayford (Martens Avenue to Chapel Hill) - Footway reconstruction to be undertaken commencing 1 July 2013.
  • Onslow Drive, Sidcup - Footway reconstruction to be undertaken commencing 23 September 2013.
  • Thursland Road, Sidcup - Footway reconstruction to be undertaken commencing 17 June 2013.
  • Upton Road, Bexleyheath (Paddock Road to No.137) - Footway reconstruction to be undertaken commencing 19 July 2013.
  • Windsor Road, Bexleyheath - Footway reconstruction completed 13 April 2013.

2013 - 2014 Carriageway Programme

  • Alma Road, Sidcup (Hatherley Crescent to Station Road)Carriageway resurfacing to be undertaken in conjunction with Station Road (See above).
  • Barnes Cray Road, Crayford (Crayford Way to Iron Mill Lane)Carriageway resurfacing to be undertaken commencing 25 July 2013.
  • Crombie Road, Sidcup (Halfway Street to No.72)Carriageway resurfacing to be undertaken commencing 15 July 2013.
  • Elmwood Drive, Bexley (Bridgen Road to No.43)Carriageway resurfacing completed 10 April 2013.
  • Eversley Cross, BexleyheathCarriageway resurfacing completed 12 April 2013. 
  • Fen Grove, SidcupCarriageway resurfacing to be undertaken commencing 5 August 2013.
  • Frognal Avenue, SidcupCarriageway resurfacing in progress.
  • Hatherley Road, Sidcup (High Street to Granville Road)Carriageway resurfacing to be undertaken. Start date to be advised.
  • Leather Bottle Green, ErithCarriageway resurfacing to be undertaken commencing 8 July 2013.
  • Kipling Road, BexleyheathCarriageway resurfacing to be undertaken commencing 17 May 2013.
  • Lincoln Road, ErithCarriageway resurfacing in progress.
  • Manor Way, BexleyCarriageway resurfacing to be undertaken commencing 17 October 2013.
  • Midfield Avenue, Bexleyheath (Hillingdon Road to Westfield Road)Carriageway resurfacing completed 12 April 2013.
  • Mount Road, Bexleyheath - Carriageway resurfacing to be undertaken. Date to be advised.
  • Shoreham Close, BexleyCarriageway resurfacing in progress.

2013 - 2014 Drainage works

  • Details to be advised. 

2012 - 2013 Bridge works

  • Eastern Way, Thamesmead (Belvedere Road Fly-over) - Centre reservation safety barriers are being installed on fly-over.

2013 - 2014 Bridge works

  • Harrow Manorway, Thamesmead - Anchorage covers on cable footbridge to be replaced. Date to be advised.

2013 - 2014 Traffic and road safety schemes

  • Barnehurst Traffic Safety Improvement Scheme - Traffic safety improvement scheme to commence in Beverley Road on 17 May 2013.
  • Long Lane, Bexleyheath - Traffic calming scheme to be implemented commencing 7 October 2013.

2012 - 2013 Regeneration schemes

  • Broadway, Bexleyheath - Extensive town centre improvement work in progress. Please refer to related media article for further information.
  • Welling Corridor - Welling High Street - Town Centre improvement works in progress.

Related Downloads

Related Contacts