Temporary Restriction of Vehicular Traffic Order 2022

  • Gas Mains Replacement Scheme in Various Roads in Erith - Notice of Making an Order
  • Slade Green Road, Erith - Notice of Making an Order
  • Betsham Road, Erith - Notice of Making an Order
  • Trinity Place, Bexleyheath - Notice of Intention
  • Gas Mains Replacement Scheme in Various Roads in Bexleyheath - Notice of Making an Order
  • Central Avenue, Welling - Notice of Intention
  • Gas Mains Replacement Scheme in Various Roads in Sidcup - Notice of Intention

Town and Country Planning Act 1990 - The Planning (Listed Buildings and Conservation Areas) Regulations 1990

  • Notification of an Application for Planning Permission within The Christ Church Conservation Area

Town and Country Planning (Development Management Procedure) (England) Order 2015 - The Planning (Listed Buildings and Conservation Areas) Regulations 1990

  • Notice of Application for Planning Permission Which May Affect The Setting of a Listed Building within a Conservation Area

Temporary Restriction of Vehicular Traffic Order 2022

Gas Mains Replacement Scheme in Various Roads in Erith - Notice of Making an Order

  1. The London Borough of Bexley, being the Traffic Authority for the above-mentioned road, in exercise of powers conferred by section 14(1) of the Road Traffic Regulation Act 1984, Hereby Give Notice that an order has been made, to enable Gas Mains Replacement Scheme in various roads in Erith, by JDT Utilities on behalf of Southern Gas Networks, the effects of which will be the introduction of:
    • Waiting restriction and Loading prohibition in roads detailed in Schedule One of this Order. These restrictions will be for the full length of the carriageway on both sides for the roads detailed in Schedule One of this Order
    Restrictions will be removed when not required.
  2. The Order will come into effect on 5 September 2022 and is valid for a period of 18 months. However, the works are expected to be completed within 52 weeks.
  3. Whilst the works are in progress, no diversion route will be required.
  4. Nothing in this Notice will apply to anything done with the permission or at the direction of a police constable in uniform or traffic warden, to emergency service vehicles, or to vehicles being used in connection with the works.
  5. The restrictions described above will apply only during such times and to such extent as shall be indicated by traffic signs as prescribed by the Traffic Signs Regulations and General Directions 2016.

Andrew Bashford

Head of Highways, Traffic and Infrastructure

Dated 31 August 2022

Further enquiries in respect of this notice should be addressed to Southern Gas Networks, 07583 671386

Schedule One

  • Parsonage Manor Way - Parking restrictions full length of the carriageway on both sides
  • Bedonwell Road - Parking restrictions full length of the carriageway on both sides
  • Trosley Road - Parking restrictions full length of the carriageway on both sides
  • Cray Road - Parking restrictions full length of the carriageway on both sides
  • Swaylands Road - Parking restrictions full length of the carriageway on both sides
  • Beltring Close - Parking restrictions full length of the carriageway on both sides
  • Stream Way - Parking restrictions full length of the carriageway on both sides
  • Matfield Way - Parking restrictions full length of the carriageway on both sides
  • Redleaf Close - Parking restrictions full length of the carriageway on both sides

Slade Green Road, Erith - Notice of Making an Order

  1. The London Borough of Bexley, being the Traffic Authority for the above-mentioned road, in exercise of powers conferred by section 14(1) of the Road Traffic Regulation Act 1984, Hereby Give Notice that an order has been made, to enable JB Riney on behalf the London Borough of Bexley to undertake highways improvement works, the effects of which will be the introduction of:
    • Prohibition of traffic on Slade Green Road from the junction with Manor Road to the junction with Richmer Road, Erith
    • Waiting restriction on Slade Green Road from the junction with Manor Road to the junction with Richmer Road, Erith
    • Loading prohibition on Slade Green Road from the junction with Manor Road to the junction with Richmer Road, Erith
  2. The Order will come into effect on 5 September 2022 and is valid for a period of 18 months. However, the works are expected to be completed within 8 nights from 7pm to 2am each night
  3. Whilst the works are in progress, an alternative route will be provided via:
    • Manor Road, James Watt Way, Queens Road, South Road, Northend Road (Southbound), Bridge Road
    • Bridge Road, Northend Road (Northbound), South Road, Queens Road, James Watt Way, Manor Road
  4. Nothing in this Notice will apply to anything done with the permission or at the direction of a police constable in uniform or traffic warden, to emergency service vehicles, or to vehicles being used in connection with the works.
  5. The restrictions described above will apply only during such times and to such extent as shall be indicated by traffic signs as prescribed by the Traffic Signs Regulations and General Directions 2016.

Andrew Bashford

Head of Highways, Traffic and Infrastructure

Dated 31 August 2022

Further enquiries in respect of this notice should be addressed to John Stevens, Highways and Amenity Services, Foots Cray Offices, Maidstone Road, Foots Cray, Kent DA14 5HS (Telephone number 020 3045 4545)

Betsham Road, Erith - Notice of Making an Order

  1. The London Borough of Bexley, being the Traffic Authority for the above-mentioned road, in exercise of powers conferred by section 14(1) of the Road Traffic Regulation Act 1984, Hereby Give Notice that an order has been made, to enable Morrison Water Services on behalf of Thames Water to install a new water connection, the effects of which will be the introduction of:
    • Waiting restriction - 4 x spaces outside and opposite 28 to 32 Betsham Road, Erith
    • Loading prohibition - 4 x spaces outside and opposite 28 to 32 Betsham Road, Erith
  2. The Order will come into effect on 6 September 2022 and is valid for a period of 18 months. However, the works are expected to be completed within 4 days.
  3. Whilst the works are in progress, no alternative route will be required.
  4. Nothing in this Notice will apply to anything done with the permission or at the direction of a police constable in uniform or traffic warden, to emergency service vehicles, or to vehicles being used in connection with the works.
  5. The restrictions described above will apply only during such times and to such extent as shall be indicated by traffic signs as prescribed by the Traffic Signs Regulations and General Directions 2016.

Andrew Bashford

Head of Highways, Traffic and Infrastructure

Dated 31 August 2022

Further enquiries in respect of this notice should be addressed to Morrison Water Services on behalf of Thames Water 020 8946 5100

Trinity Place, Bexleyheath - Notice of Intention

  1. The London Borough of Bexley, being the Traffic Authority for the above-mentioned road, in exercise of powers conferred by section 14(1) of the Road Traffic Regulation Act 1984, Hereby Give Notice that, to enable Powercare on behalf of UK Power Networks to install a new electrical connection they intend to make an Order the effects of which will be the introduction of:
    • Prohibition of traffic on Trinity Place from the Church entrance to the dead end
  2. The Order will come into effect on 12 September 2022 and is valid for a period of 18 months. However, the works are expected to be completed within 12 days.
  3. Whilst the works are in progress, no alternative route will be required.
  4. Nothing in this Notice will apply to anything done with the permission or at the direction of a police constable in uniform or traffic warden, to emergency service vehicles, or to vehicles being used in connection with the works.
  5. The restrictions described above will apply only during such times and to such extent as shall be indicated by traffic signs as prescribed by the Traffic Signs Regulations and General Directions 2016.

Andrew Bashford

Head of Highways, Traffic and Infrastructure

Dated 31 August 2022

Further enquiries in respect of this notice should be addressed to Liam Suat, Powercare 07875 117734

Gas Mains Replacement Scheme in Various Roads in Bexleyheath - Notice of Making an Order

  1. The London Borough of Bexley, being the Traffic Authority for the above-mentioned road, in exercise of powers conferred by section 14(1) of the Road Traffic Regulation Act 1984, Hereby Give Notice that an order has been made, to enable JDT Utilities on behalf of Southern Gas Networks to undertake their Gas Mains Replacement Scheme in Various Roads in Bexleyheath, the effects of which will be the introduction of:
    • Waiting restriction and Loading prohibition in roads detailed in Schedule One of this Order. These restrictions will be for the full length of the carriageway on both sides for the roads detailed in Schedule One of this Order
    Restrictions will be removed when not required.
  2. The Order will come into effect on 5 September 2022 and is valid for a period of 18 months. However, the works are expected to be completed within 15 weeks.
  3. Whilst the works are in progress, no alternative route will be required.
  4. Nothing in this Notice will apply to anything done with the permission or at the direction of a police constable in uniform or traffic warden, to emergency service vehicles, or to vehicles being used in connection with the works.
  5. The restrictions described above will apply only during such times and to such extent as shall be indicated by traffic signs as prescribed by the Traffic Signs Regulations and General Directions 2016.

Andrew Bashford

Head of Highways, Traffic and Infrastructure

Dated 31 August 2022

Further enquiries in respect of this notice should be addressed to Southern Gas Networks - 07583 671386

Schedule One

  • Bostall Park Avenue - Parking restrictions full length of the carriageway on both sides
  • Long Lane - Parking restrictions on both sides of the carriageway between Brampton Road and Pickford Lane
  • Cumberland Drive - Parking restrictions full length of the carriageway on both sides
  • Barry Avenue - Parking restrictions full length of the carriageway on both sides
  • The Quadrant - Parking restrictions full length of the carriageway on both sides
  • Melanie Close - Parking restrictions full length of the carriageway on both sides
  • Westbourne Avenue - Parking restrictions full length of the carriageway on both sides
  • Mark Close - Parking restrictions full length of the carriageway on both sides
  • Kipling Road - Parking restrictions full length of the carriageway on both sides
  • Malvern Avenue - Parking restrictions full length of the carriageway on both sides
  • Oakhurst Avenue - Parking restrictions full length of the carriageway on both sides
  • Oakhurst Gardens - Parking restrictions full length of the carriageway on both sides
  • Clare Way - Parking restrictions full length of the carriageway on both sides
  • Brampton Road - Parking restrictions at the Junction of Long Lane both sides of the carriageway

Central Avenue, Welling - Notice of Intention

  1. The London Borough of Bexley, being the Traffic Authority for the above-mentioned road, in exercise of powers conferred by section 14(1) of the Road Traffic Regulation Act 1984, Hereby Give Notice that, to enable Network Rail to undertake a detailed examination of the bridge (740-BEX-11-22). they intend to make an Order the effects of which will be the introduction of:
    • Prohibition of traffic 20m either side of the rail bridge (740-BEX-11-22) Central Avenue, Welling
  2. The Order will come into effect on 13 September 2022 and is valid for a period of 18 months. However, the works are expected to be completed within 1 night from 10pm to 6am on 14 September 2022.
  3. Whilst the works are in progress, an alternative route will be provided via:
    • Central Avenue, Bellegrove Road, Wickham Street and vice versa
  4. Nothing in this Notice will apply to anything done with the permission or at the direction of a police constable in uniform or traffic warden, to emergency service vehicles, or to vehicles being used in connection with the works.
  5. The restrictions described above will apply only during such times and to such extent as shall be indicated by traffic signs as prescribed by the Traffic Signs Regulations and General Directions 2016.

Andrew Bashford

Head of Highways, Traffic and Infrastructure

Dated 31 August 2022

Further enquiries in respect of this notice should be addressed to Centurion Traffic Management - 0113 277 5360

Gas Mains Replacement Scheme - Various Roads in Sidcup - Notice of Intention

  1. The London Borough of Bexley, being the Traffic Authority for the above-mentioned road, in exercise of powers conferred by section 14(1) of the Road Traffic Regulation Act 1984, Hereby Give Notice that, to enable WCB Utilities on behalf of Southern Gas Networks to undertake their Gas Mains Replacement Scheme in various roads in Sidcup, they intend to make an Order the effects of which will be the introduction of:
    • Waiting restriction and Loading prohibition in roads detailed in Schedule One of this Order
    Restrictions will be removed when not required.
  2. The Order will come into effect on 8 September 2022 and is valid for a period of 18 months. However, the works are expected to be completed within 15 weeks.
  3. Whilst the works are in progress, no alternative route will be required.
  4. Nothing in this Notice will apply to anything done with the permission or at the direction of a police constable in uniform or traffic warden, to emergency service vehicles, or to vehicles being used in connection with the works.
  5. The restrictions described above will apply only during such times and to such extent as shall be indicated by traffic signs as prescribed by the Traffic Signs Regulations and General Directions 2016.

Andrew Bashford

Head of Highways, Traffic and Infrastructure

Dated 31 August 2022

Further enquiries in respect of this notice should be addressed to Charlotte Marsh, SGN - 01689 881300

Schedule One

  • Haddon Grove - Full length of the carriageway, both sides of the road
  • Beech Avenue - Full length of the carriageway, both sides of the road
  • Cedar Avenue - Full length of the carriageway, both sides of the road
  • Elmcroft Avenue - Full length of the carriageway, both sides of the road
  • Ashcroft Crescent - Full length of the carriageway, both sides of the road
  • Burnt Oak Lane - From the junction with the Oval to the junction with Ashcroft Avenue, both sides of the carriageway
  • Wellington Avenue - From the junction with Ashcroft Crescent to the junction with Burnt Oak Lane, both sides of the road
  • Willersley Avenue - At the junction with Haddon Grove, both sides of the carriageway
  • Ashcroft Avenue - At the junction with Ashcroft Crescent, both sides of the carriageway

Town and Country Planning Act 1990 - The Planning (Listed Buildings and Conservation Areas) Regulations 1990

Notification of an Application for Planning Permission within The Christ Church Conservation Area

Proposed development at 15 Victoria Road, Sidcup, Kent

I give notice that application is being made by Mr D Nguyen to the London Borough of Bexley Council for planning permission for:-

Erection of a detached outbuilding for use as a summerhouse.

Members of the public can view the application, and submit any observations on the proposal, using the Planning Application Information Online system.

Anyone who wishes to make representations about this application should do so by 21 September 2022, quoting reference 22/01688/FUL. Written responses should be addressed to Development Management, Civic Offices, 2 Watling Street, Bexleyheath, DA6 7AT.

Due to the Local Government (Access to Information) Act 1995, the Council will be legally obliged to make any response to this notice available for public inspection.

Robert Lancaster

Head of Planning & Regulatory Services

Date 31 August 2022

Town and Country Planning (Development Management Procedure) (England) Order 2015 - The Planning (Listed Buildings and Conservation Areas) Regulations 1990

Notice of Application for Planning Permission Which May Affect The Setting of a Listed Building within a Conservation Area

Proposed development at 34 North Cray Road, Bexley, Kent

I give notice that application is being made by Mr Cole to the London Borough of Bexley Council for planning permission for:-

Listed Building Consent for the Change of use from office and storage (Use Class B1 and B8) to one x 4-bed residential dwelling incorporating a garage together with alterations and erection of an orangery.

Members of the public can view the application, and submit any observations on the proposal, using the Planning Application Information Online system.

Anyone who wishes to make representations about this application should do so by 14 September 2022, quoting reference 22/01870/LBC. Written responses should be addressed to Development Management, Civic Offices, 2 Watling Street, Bexleyheath, DA6 7AT.

Due to the Local Government (Access to Information) Act 1995, the Council will be legally obliged to make any response to this notice available for public inspection.

Robert Lancaster

Head of Planning & Regulatory Services

Date 24 August 2022