Trial hole
Trial holes are required when building a first-floor extension on top of an existing structure and require the foundations to be checked to ensure that they adequate to take additional loading:
- a fee of £60.00 is required with the application to cover the cost of the inspection
- the fee paid will be transferred if an application of the extension is within three years of submitting the trial hole application