The London Borough of Bexley has urged the Mayor of London to reconsider proposed plans for growth in Bexley that fail to recognise and protect our green belt and that will result in local people having less say in new housing developments.
In our wide ranging 56-page response to the draft London Plan, that sets out the Mayor’s housing and development targets for London, the Council has argued that the approach to growth proposed ignores transport needs in Bexley, will result in fewer homes than the Borough requires for families and in the loss of some of our green belt, adversely affecting the character of our great Borough.
The Council is calling for the draft London plan to be revised to ensure that the right balance is struck between respecting Bexley’s character and meeting our development needs.
Some of the key proposals in the draft London Plan that will affect future growth in our Borough negatively include;
- Plans for 12% of new homes to be three or more bedrooms, compared with Bexley's local need for six in ten homes to be family sized.
- Identification of green belt land near Sidcup and Bexley Village that should be developed for housing within 20 years.
- Identification of green belt land north of Maidstone Road for industrial release within 10 years.
- Establishing a fast-track route for developers meeting a lower affordable housing target of 20 per cent; Bexley has previously achieved 41% over 6 years and this lowering of standards will reduce the quality of any new housing.
- The plan identifies no major transport investment in the Borough. It suggests that Bexley is a lot better connected by public transport than it actually is – pushing up expected densities and driving down parking standards all of which threaten the Borough’s character, reduces amenities and impacts on road safety.
- The draft plan suggests that there is a substantially increased need for gypsy and traveller pitches in Bexley despite local evidence to the contrary.
Councillor Cameron Smith, Deputy Leader and Cabinet Member for Economic Growth and Infrastructure said:
The draft London Plan will not deliver the homes Bexley desperately needs.
The draft plan says nothing about extending the DLR or the Elizabeth Line into Bexley to support regeneration and unlock more homes. It could also stop Bexley from pushing developers to build more family-sized homes so people can start and grow their families here.
Instead, the Mayor of London proposes future green belt releases for poorly connected developments and warehouses despite Bexley having vacant industrial land.
We need a draft London Plan that enables Bexley to meet its local needs, protects our green spaces and delivers much-needed transport investment, not a one-size-fits-all approach.”
The London Borough of Bexley has a statutory duty to incorporate the Mayor’s London Plan into its local Development Plan that sets out how the Borough meets its development needs.
The draft London Plan was published for consultation in July 2026 for a three-month period which ran until 15 October.
Responses from Local authorities including the London Borough of Bexley’s will be considered and then the Mayor’s draft London Plan will be independently examined in summer 2027.
If you would like further information on our response to the draft London Plan, please email SP>eam@bexley.gov.uk.
Our letter to the Mayor’s draft London Plan
Place
Civic Offices, 2 Watling Street
Bexleyheath DA6 7AT
020 8303 7777
y/r
Date: 15 October 2026
The person dealing with this matter is: Clare Loops, Planning Policy and Housing Strategy Manager
Sadiq Khan, Mayor of London, Draft London Plan
London Plan Team, Planning & Regeneration
City Hall, Kamal Chunchie Way
London, E16 1ZE
RE: London Borough of Bexley’s response to the Mayor’s draft London Plan
Dear London Plan Team
The Council’s response to the draft London Plan is set out by chapter as the questionnaires are provided this way. For each of the chapters with draft policies, questions are put forward to be considered when responding to whether or not each policy meets the test of soundness, which is to be positively prepared, justified, effective and consistent with policies published within the revised National Planning Policy Framework (NPPF):
- Does the Plan identify the key needs of the area appropriately?
- Are there additional needs that should be addressed?
- Is the draft policy supported by proportionate and appropriate evidence?
- Have reasonable alternatives been considered? Our IIA is here
- Are there alternatives you think should have been assessed?
- Can the Plan be delivered?
- What barriers may affect implementation?
- Do you consider the Plan is consistent with national policy? If not, what are the areas of inconsistency?
As such, the question numbers restart with each chapter for chapters 2 to 6 and this numbering system is followed in the Council’s responses from question 6 onwards. Separate comments are made to the annexes (or within a policy response where relevant). In addition, general comments are provided below that address overarching concerns that the Council has for the draft Plan.
Chapter 1 Overview of the Plan and good growth objectives – General comments
The Plan as it is written is not deliverable. It seeks to accommodate too much growth across too many uses and will exceed the existing capacity of land in London. It will result in real harm, with a one size fits all approach to development that will destroy London’s local diversity and distinctiveness. These are characteristics of London beloved by Londoners.
The Plan’s imperative seems to be to maximise rather than optimise development, creating densities that far exceed anything that has been delivered before in London Borough of Bexley. Indeed, the proposed residential densities are set higher than any existing residential areas in London – even Tower Hamlets, a very dense residential borough, does not achieve this.
The Plan should be promoting mixed and balanced communities. Instead, the Plan’s proposed growth will change forever what makes London a special city, one that welcomes all types of people at all stages in life. It will make the provision of family housing almost impossible, pushing families out of the capital and far from the employment, education and leisure opportunities London offers.
The Plan needs to prioritise well designed development that meets the needs of local residents, in locations that can sustain good growth, supported by meaningful investment in connectivity, particularly in outer London where limited transport choices reduce development viability and access to jobs and markets.
Chapter 2 Making best use of land and achieving good growth
The focus of the Council’s responses to this chapter is the need for justification of the spatial approach taken, which appears to stray into matters that the new National Planning Policy Framework says should be dealt with through local plans.
MBUL1: Spatial Strategy
6 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
No
7 Answer Q7 only if you have chosen No for Q6. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
There is a statutory basis for establishing a London-wide spatial strategy, recognised by national policy. However, the NPPF expressly states that an SDS should not deal with local maters or allocate specific sites or land, with site allocation remaining a matter for local planning authorities. This calls into question the approach taken by the draft policy. MBUL1 does not remain a strategic spatial strategy as it strays into matters that the new NPPF says should be dealt with through local plans.
The approach in the draft policy moves from a strategic approach into effectively directing individual boroughs towards particular Green Belt releases. Whilst the London Plan should identify the strategic need and broad locations in which Green Belt boundary changes may need to be considered, it should not predetermine the outcome of the detailed Green Belt review which must be undertaken through the relevant local plan.
A key concern is whether this particular spatial strategy as set out in the draft policy is justified. The evidence should sufficiently demonstrate the need for 56,000 homes and 350 hectares of industrial land outside of London’s built-up areas identified in part B of the policy. All reasonable alternatives should have been genuinely examined before identifying Green Belt land for release, to ensure a consistent approach with the NPPF, particularly regarding the treatment of grey belt. And beyond the 10-year strategy are the 20-year projections where the shortfall from the government’s identified 850,000 net new homes is proposed to be accommodated in ‘future BLGs.’
The published 2026 NPPF sets out the division of evidence between the London Plan and local plans. At the regional level, the SDS needs to be sufficiently justified for it to establish:
- the London-wide spatial strategy;
- the broad locations;
- the strategic role of Green Belt;
- the broad scale of growth;
- and the infrastructure framework.
London boroughs, when preparing local plans will prepare the evidence to establish:
- exact Green Belt boundary changes;
- grey belt;
- specific release parcels;
- precise capacity;
- site allocations;
- infrastructure;
- deliverability;
- and the local exceptional circumstances case.
The NPPF specifically says that an SDS land assessment can be strategic to support identification of broad locations, whereas an assessment for a plan allocating specific sites must assess availability, suitability, achievability, capacity and delivery timescales.
Policy MBUL1 sets out a requirement to make provision, beyond the existing built-up area, for ‘further strategic growth’ for BLGs in B(2) and ‘future strategic growth’ in B(7) for future candidate BLGs. For Bexley, one of each of these has been identified: no. 70 on the 10-year key diagram (for industrial development) and no. 78 on the 20-year diagram (for residential-led mixed-use). In both instances the Council considers the inclusion of these BLGs is not justified. The Council’s response to policies GLE2, PV5 and PV7 challenges the assumptions that have been made in the evidence and these responses directly relate to policy MBUL1. BLG70 – M20 (Swanley Area) is not considered by the Council to be required for displaced need for storage and distribution given the level of vacant industrial land within the borough. And BLG78 – Sidcup and Bexley has no ‘well-connected’ railway stations identified nor any prospect of existing stations being improved sufficiently to meet the required standard.
Further to this, BLG78 is identified as a future candidate BLG. The Plan should make explicit what exactly the status of land identified as ‘future candidate BLG’ is and whether the Mayor intends for this land to constitute safeguarded land for the purposes of NPPF policy GB4. If there is no intention to do this, then this designation will not have material planning weight.
8 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
MBUL2: Optimising the use of land and site capacity
9 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
No
10 Answer Q10 only if you have chosen No for Q9. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
Whilst appreciated that the Sustainable Access Measure (SAM) connectivity tool accounts for travel times to jobs, services and amenities, as written draft policy MBUL2 appears to focus purely on housing delivery, failing to clearly set out how the delivery of amenities and services, necessary to support housing delivery, should also come forward. The Council considers the London Plan should address such requirements for services and amenities, stating that these should draw from local contexts and the needs of local people.
The Council notes the potential benefit of identifying and allocating small sites for residential development, however the practicalities of doing this would require increased resource to identify, collate and maintain a register of these site allocations. With this ambition, the Greater London Authority should provide adequate funding to LPAs to make this ambition actionable.
The Council recently adopted design guidance, including a document focused on small sites, which evolved from a robust local evidence base and reflects small site typologies that are common across the borough. There is significant concern that a London-wide approach will not benefit from this same level of specificity. As such, it is considered that the London Plan should directly address those plan-making authorities where local guidance is already available stating that such guidance should not be undermined by the London Small Site Design Code. The Plan should allow for plan-making authorities to review and amend guidance as necessary to respond to the Mayor’s policy/guidance on small sites.
The Council is supportive in principle of the Optimisation Framework as an initial analysis tool, particularly where plan-making authorities have not yet defined their own approaches to optimisation. It is considered positive that density is linked to transport connectivity, although there is significant concern that the SAM metric is not a robust assessment tool in all circumstances. In this context local authorities should be specifically allowed to undertake local analysis to assess relative accessibility and adjust density ranges accordingly.
Importantly, the London Plan should be clear in stating that where a plan-making authority has already designated areas for optimisation that have evolved from a strong local evidence base, and/or undertaken local accessibility assessments using alternative and more locally appropriate accessibility measures this will not be overruled by the London Plan.
The draft Plan should note that SAM is not absolute, and that LPAs should be able to set appropriate building heights and types (e.g. family housing) within their locale and respond to sensitivities such as heritage assets where their local evidence justifies such an approach, even where this contradicts the Optimisation Framework. In addition, there are instances where the implementation text would benefit from providing more context and clarity, for example in 2.26, where it is unclear in what regards sensitivity to change should be considered. The same clause also fails to set out what the robust assessment should entail, information useful for LPAs and applicants alike.
The Council would also note that, at the scale provided in the PDF version of the draft Plan, Figures 2.4 and 2.5 are hard to read and become pixelated when zoomed in. The inclusion of borough boundaries on Figure 2.5 would also make the map more legible. Opportunities to overlay the maps could further assist with legibility, as could providing an interactive map of both figures, akin to the WebCAT PTAL tool. There is little point to including these maps within the policy implementation text otherwise.
It is also considered that including actual built examples of places where such densities have been achieved in London would be useful, particularly outer London. The Council is not aware of any built examples in Bexley.
It is concerning that the supporting text for the policy at paragraph 2.39 states that the Optimisation Framework, a key component of policy MBUL1, “sets a more generally applicable approach across boroughs to ensure that all parts of London play an appropriate role in meeting housing need. Otherwise, it is likely that individual boroughs – acting separately and from their local perspective – would not optimise these opportunities that collectively are vital to help meet housing need for London as a whole and to do so in a way that avoids disproportionately impacting on some areas and communities.” This implies that the minimum densities have been set to achieve a target, rather than be based on well evidenced research or that seek to deliver mixed and balanced communities.
11 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
MBUL3: Tall buildings
12 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
No
13 Answer Q13 only if you have chosen No for Q12. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
The Council is largely supportive of the policy, particularly that plan-making authorities will have the means to assess and define areas more or less sensitive to tall buildings. The inclusion of implementation text 2.50 is considered especially useful.
It is noted, however, that the draft Development management policies remove explicit reference to avoiding harm to heritage assets and their setting, which is considered an oversight that should be addressed. Whilst included in the London Plan 2021, reference to testing to understand the environmental impact of a tall building proposal has also been omitted from MBUL3, where this testing should be explicitly noted to support the decision-making process.
The Development management policies also fail to include details of how a tall building(s) would exist at different stages of a proposed cluster, as there will inevitably be periods of time where one is being developed and not another. Similarly, the Plan should also address instances where a cluster is proposed but fewer developments than consented are delivered.
Development management policy A(4) references exemplary design and architectural quality but fails to note how this is defined and what LPAs should assess schemes against. Such information would benefit all parties in the decision-making process.
14 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
MBUL4: Utilities capacity, connectivity, and resilience
15 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
No
16 Answer Q16 only if you have chosen No for Q15. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
Plan-making Policy A (1) assumes that London boroughs have a degree of control over utility network investment plans. The Council, through its Infrastructure Delivery Plan review process, already liaises with utility companies to help develop a clear understanding of energy supply and network capacity, water supply, drainage and wastewater capacity in line with the approach set out within the NPPF. As part of this engagement, the Council provides utility companies with information that assists with their network energy planning.
However, Policy MBUL4 A (1) goes beyond the NPPF requirement for local plans to indicate broad locations for strategic infrastructure which has been informed by engagement with utility providers, regulators and network operators. As recognised within the supporting Utilities Impact Assessment, individual utility companies undertake their own network investment planning processes that are regulated separately from the spatial planning regime. The Council therefore questions whether it is reasonable to require boroughs to proactively identify acceptable design solutions that address specific infrastructure deficiencies and requirements within their local plans.
17 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
MBUL5: Sustainable transport to enable London’s growth
18 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
No
19 Answer Q19 only if you have chosen No for Q18. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
Part A of policy MBUL5, and the criteria in Box MBUL5, do not take account of the comparative paucity of transport infrastructure in Bexley, which is also reflected in the lack of local transport interventions in Annex D and A(1). The omission of references to critical public transport infrastructure improvements in Bexley is considered a startling oversight and significant missed opportunity within the draft Plan to realise a large quantum of sustainable and inclusive growth in Bexley Riverside.
Omissions include the extension of the Elizabeth Line eastwards of Abbey Wood that is supported by an existing safeguarding line and a comprehensive and convincing strategic outline business case (SOBC). The extension of the DLR beyond Thamesmead to Belvedere Station is also not referenced, when it would enable interchange with national rail services, thereby increasing transport choice, expanding the fare box and thereby enhancing scheme viability and unlocking a range of potential development sites in the Belvedere area, including the intensification of employment land.
Consideration should also be given to improved orbital and north-south public transport connectivity and proposals that would assist with journeys over the River Thames, such as the extension of the DLR and the Elizabeth Line. Moreover, the transport interventions in Annex D do not consider those that may be required immediately outside London that already have an impact on travel in, out and across the capital, such as Junction 1A at the Dartford Crossing, and the intersections of the A2 (Junction 2) and A20 (Junction3 ) with the M25.
In addition, the Sevenoaks District Local Plan, which has just completed its Regulation 19 public consultation, proposes release of Green Belt sites adjacent to the Greater London boundary at the London Boroughs of Bexley and Bromley. This will add further congestion to junction 3 and to the Sidcup by pass (BLG64 in Table C3 of Annex C). Indeed, Kent County Council has raised concerns with the capacity of the transport network in this location.
Part A(2) refers to reducing road traffic to facilitate growth. However, constraining vehicle movements in terms of volume will fetter good growth in the context of creating so many homes and jobs. A more appropriate approach will be to encourage modal shift to non-car travel, especially public transport, thereby reducing the proportion of trips by car where growth will see an overall increase in person trips. Constraining road capacity may also have an adverse impact on economic development in areas such as Lower Belvedere, where good connections to the strategic road network are a major locational factor and there are no practical alternatives to road-based freight. Local flexibility in such instances would aid growth without prejudicing the overall objectives of the Plan.
Whilst local transport interventions identified in local plans pursuant to Part B(1) will need full, evidential justification, this should be an independent exercise that conforms with national guidance and not simply supplementary to TfL’s own strategic transport modelling as set out in Part B(2). It is considered that a range of connectivity tools should be available for use and not just TfL’s Sustainable Access Measure (SAM). There is significant concern that sole reliance on SAM will not properly reflect local conditions as it is not sufficiently granular and somewhat opaque or general in some of its assumptions.
Comments on cycle and car parking standards under B(3) and locations for cycle parking B(4) can be found under GHR11. However, reliance on typical standards for all sizes of developments is less likely to accurately determine actual parking need than a case-by-case appraisal taking into account local car ownership levels and existing socioeconomic factors or connectivity levels. Moreover, it is considered to be blatantly contradictory that the draft Plan allows for supplementary local evidence to inform transport challenges and requirements in local plans but then insists in part B(3) that the standards set out in policy GHR11 cannot be altered. This discounts without justification the potential for local circumstances to allow for variations in certain cases and should be rectified both here and in the parking standards policy.
The proposition in B(5) that land can only be safeguarded for a transport-related use following consultation with TfL may preclude minor local interventions that could improve access to facilities for existing services rather than more strategic infrastructure (such as those listed in figure 2.122 of Bexley’s Design Guide SPD Part 2).
The locational qualifiers are not needed for B(6)i or B(6)ii. These matters should be controlled through delivery and servicing plans (and construction management plans) for developments generally. For schemes with a large logistical function a transport management plan would be more appropriate, including barred routes and maximum hourly flows on the road network (monitored by AI sensors), all of which can be monitored with appropriate penalties for breaches.
Compliance with Part C(1) is required generally, but the TfL guidance should not be the sole arbiter. The Council’s thresholds and scope for transport statements and transport assessments for different land use classes are set out in in local guidance in the Bexley Design Guide Part 2 – Technical Handbook, which should take precedence as these are more appropriate for developments in the borough.
Comments on the use of GHR11, in Part C(2), are the same as for B(3) and B(4) above, while freight, delivery and servicing covered by Part C(3) should reflect the comments for B(6)i and B(6)ii above.
Part C(4) is also supported, although safeguarding of land should not rely on TfL or other transport operator approval as this may undermine opportunities for minor improvements to facilities (see comments to B(5) above).
Part D(1) is supported as it relates to measures being commensurate to the scale and type of development, and internal servicing should include possible charging facilities (as well as space) for cargo bikes along with service corridors / portering routes where appropriate and with relevant storage.
Freight, delivery and servicing facilities must be safe and should be complementary to the public realm, provided this does not compromise the principal servicing function. Possible conflicts should be resolved by on-site or off-site management measures where possible, particularly in respect of D(2)i and D(2)ii.
24 hour servicing may be possible, subject to the operating hours of the development and the neighbouring land uses. However, the impact on nearby residential uses must be considered, even in a town centre location.
Adequate protection and mitigation for transport infrastructure set out in Part E(1) should include local schemes set out in local plans and related infrastructure delivery plans and not just those listed in Annex D.
Similarly, the avoidance of harm to, loss of and/or expansion of active travel infrastructure covered in Part E(2) should include local cycling and walking networks and not just those included in TfL’s lists.
Is it correct to assume that the ‘other significant infrastructure’ referred to in Part F includes anything in a local plan and infrastructure delivery plan that is NOT in Annex D? if not, then it should.
The blanket refusal of ‘drive throughs or low-density retail parks’ suggested by Part G may be unreasonable where the drive through can be incorporated into a higher density development or where local communities do not have suitable alternatives to such facilities. Suitable connectivity criteria should be developed to ensure such development can proceed where needed.
20 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
MBUL6: Design for a growing, changing city
21 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
No
22 Answer Q22 only if you have chosen No for Q21. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
The Council largely welcomes the inclusion of development management policies, in particular B(8) regarding the inclusion of external shading to windows. It is positive to see this addressed within policy rather than guidance as this will provide the Council with a stronger position during the decision-making process. It is useful that this links to policy GHR4 Heat Risk, which is also a welcome inclusion. The Council also considers that the mention of robust materials in part B(4) of the policy could be expanded to reference energy efficiency and low carbon materials to meet climatic sustainability aims.
There are, however, opportunities for the policy to be amended and better aligned with the London Plan 2021, because as written, the onus in implementing the policy appears skewed towards decision-makers, rather than those proposing developments.
For example, this draft Plan no longer mentions the importance of maintaining design quality. This is clearly set out in London Plan 2021, encouraging planning authorities to consider conditioning the ongoing involvement of the original design team through to completion, a positive inclusion that emphasises the benefit, to applicants, of continuity to maintaining design quality. Such policy also strengthens LPAs position at decision-making stage, and its omission is considered an oversight that should be reintroduced in the draft London Plan. The Council also considers that the policy could include mention of alternative procurement methods, such as insurance-backed alliancing, which aim to enhance project delivery and encourage more collaborative working.
Similarly, Policy D4 in the London Plan 2021 references the importance of “avoiding deferring the assessment of design quality of large elements of a development to the consideration of a planning condition or referred matter,” which has not been included in the draft London Plan. This serves to diminishes LPAs position during determination and could lead to diminished design quality, particularly on large-scale projects and masterplans and where applicants push for certain elements to be conditioned. The Council considers that the importance of avoiding deferring this assessment of design quality should be reintroduced within the London Plan to support decision-makers and ensure design quality is maintained.
The Council considers it would be appropriate and useful to include instances where and how applicants should demonstrate how criteria in the Development management policies have been met, for example within drawings, the DAS and other relevant supporting statements. Again, this would support the decision-making process by making requirements explicit to both applicants and decision-makers.
The policy’s implementation text puts the onus on LPAs to use design review in the decision-making process. From experience, however, applicants are often hesitant to engage with the design review process – especially where timeframes are tight. The Council therefore considers that an additional layer of policy is required, stating that applicants – particularly those with major development proposals – actively and fully engage with the design review process. The policy also fails to reference community engagement when discussing design review. This is important to ensure high-quality design that works for Londoners.
23 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
MBUL7: London's Heritage
24 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
Don’t know
25 Answer Q25 only if you have chosen No for Q24. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
The Council would comment that this policy places an additional requirement upon LPAs which would need to be funded. With regards to soundness, the funding parameters could be a barrier to implementation.
26 If you have answered ‘Don’t know’ and want to explain why, please do so.
The Council broadly welcomes the ambitions of the policy but would offer the following comments:
Part A of MBUL7 places the requirement on LPAs to develop and maintain up-to-date Archaeological Priority Areas for plan-making and decision-taking purposes. This requirement includes identifying non-designated heritage assets of archaeological importance, which places an additional requirement upon LPAs that would need to be funded. The funding parameters could be a barrier to implementation. Furthermore, the Council would also query how maintaining 'up to date' Archaeological Priority Areas would work in practice (e.g. what timescales this would reflect, who will manage this).
With regard to LPAs being encouraged to develop local heritage strategies (Part B of MBUL7), further guidance would need to be published regarding what form these strategies should take e.g. what evidence would need to be provided and how these might be funded.
Part F of MBUL7 is welcomed, which follows the requirement suggested within the Greater London Archaeology Advisory Service (GLAAS) Charter. In practice, the Council currently applies a similar requirement for sites that are 0.5ha or larger as part of its decision-making process.
MBUL8: Inclusive Design
27 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
Yes
28 Answer Q28 only if you have chosen No for Q27. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
N/A
29 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
MBUL9: Healthy Streets and Public Realm
30 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
Don’t know
31 Answer Q31 only if you have chosen No for Q30. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
N/A
32 If you have answered ‘Don’t know’ and want to explain why, please do so.
With regards to healthy streets, the Bexley Local Plan, extant SPDs and the LIP all follow a ‘healthy streets’ approach in general. In respect of 2.116 under Implementation, TfL pan-London general guidance is supported but the greater detail set out in local guidance and toolkits, including that in local SPDs, must take precedence when reflecting local needs.
It is welcome to see that under Locations ‘public realm’ includes areas within buildings and not just streets, and that Part B(1) includes walking and cycling connections that can be identified by borough through transport assessments (as Annex Table D2 is not very specific on these).
Avoiding vehicle [crossings] in B(5) would also need to meet property and highway legislation, as there is a legal right for landowners to gain access from the highway generally unless there is a specific presumption against it owing to the category of the road and/or they have an alternative access from another road.
Further, some development management policies could be expanded to add clarity – for example reference to social spaces in B(8) should include mention of these spaces being provided for a range of ages and abilities and should be caveated by the words ‘where appropriate’ as not all spaces will be suitable for such initiatives. The Council considers that C(3) should be expanded to ensure seating is located appropriate to its immediate context and C(4) should expanded to require applicants to consider who will maintain and be responsible for such items to ensure ongoing water quality and safety.
MBUL10: Security and safety
33 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness
Yes
34 Answer Q34 only if you have chosen No for Q33. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
N/A
35 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
Examination in public
36 If you are seeking any modification to the draft Plan, please confirm whether you would wish to appear at the Examination in Public, if requested to do so by the Inspector. If so, we will pass your details to the Inspector who will decide whether to issue a formal invitation to you at a later date. The Inspectors themselves would set the dates that the hearing would be held.
Yes
No
37 Answer Q37 only if you have chosen Yes to Q36. Please explain why you consider it necessary for you to attend the Examination in Public.
The Council raises concerns for some policies in this chapter as to whether they meet the ‘test of soundness’ (e.g. positively prepared, justified, effective and consistent with policies published within the revised National Planning Policy Framework).
General comments
38 If you have any general comments about any of the policies in this chapter, please record them here. Where you have a comment about a specific policy, it would help us if you could make clear which policy your comment relates to.
N/A
Chapter 3: Delivering the homes and neighbourhoods Londoners need
The focus of the Council’s response to this chapter is the need for a greater recognition of local circumstances and evidence, particularly where the Draft London Plan seeks to introduce London-wide targets/ requirements that could materially affect Bexley’s ability to determine the appropriate type and tenure of housing, which is necessary to ensure that mixed and balanced communities are delivered in Bexley.
HN1: Increasing London’s housing stock
6 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
Yes (see general comments section at Q38)
7 Answer Q7 only if you have chosen No for Q6. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
N/A
8 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
HN2: Protecting and reshaping housing
9 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
No
10 Answer Q10 only if you have chosen No for Q9. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
The Council considers that Policy HN2 is not sound as currently drafted, particularly in its approach to the protection of non-self-contained accommodation. Although the evidence base in the London Strategic Housing Market Assessment (SHMA) demonstrates significant housing need across London it does not clearly establish a need for all forms of non-self-contained accommodation (including HMOs), nor justify giving such accommodation the same level of policy protection as affordable, supported or specialist housing - which clearly meets an identified housing need.
The Council recommends that HN2 is amended to provide greater flexibility for London boroughs to determine whether non-self-contained accommodation remains appropriate, having regard to locally identified housing need and adopted local planning policies. The policy should distinguish between accommodation which meets an identified specialist or supported housing need and the broader general non-self-contained accommodation such as HMOs.
The Council considers that HN2 goes too far in seeking to protect non-self-contained accommodation, without sufficient distinction between the different forms and purposes of such accommodation. This is particularly relevant for Bexley. The Council has a strong preference for the provision of self-contained housing and has not identified a level of local need which would justify a general presumption in favour of retaining or increasing non-self-contained accommodation - including HMO-type accommodation.
The Council is also concerned that the London SHMA does not provide sufficiently clear evidence to demonstrate that increasing/ retaining the supply of HMOs or other forms of non-self-contained accommodation is required to meet London's housing need. The SHMA identifies significant housing need, including substantial need for affordable housing and 1-bed accommodation – however, the existence of an overall housing shortage does not in itself demonstrate specifically that non-self-contained accommodation is the appropriate form of housing to meet that need.
The Council understands that specialist and supported accommodation which meets an identified need and can be categorised as general non-self-contained accommodation may warrant strong protection where local evidence demonstrates a continuing need - whereas the latter should be assessed against local housing requirements and adopted local development plan policies.
The Council is particularly concerned that a blanket approach to the protection of non-self-contained accommodation could constrain the Council’s ability to respond to changing local circumstances. This could include situations where existing accommodation is no longer appropriate, where there is limited demand for a particular form of accommodation, or where redevelopment could provide a greater number of suitable and much needed, self-contained homes.
As such, the Council considers that locally identified need should be the determining factor, as opposed to the assumption that all non-self-contained accommodation represents a necessary component of London's housing supply without consideration of local context.
11 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
HN3: Delivering affordable housing
12 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
No
13 Answer Q13 only if you have chosen No for Q12. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
The Council has concerns that the proposed threshold approach and tenure requirements would materially constrain the ability of London boroughs such as Bexley to respond to locally evidenced housing need. In particular the new standard minimum 60:40 tenure split, and the requirements relating to intermediate housing and Key Worker Living Rent do not adequately reflect Bexley's adopted policies, local evidence or its position as a non-stock holding authority.
The Council also questions how affordable housing on any given site can be maximised in the context of the 20% threshold. Bexley has been securing more than this and will not want to lose out on potential affordable housing in the context of the fast-track route. However the policy appears to have no specific mechanism to ensure higher provision in appropriate circumstances. Further to this, the lower threshold may reduce the level of grant the Council’s delivery partner’s receive from the Greater London Authority.
The Council recommends that HN3 is amended as follows:
- To provide increased flexibility for local authorities to secure a level of affordable housing that reflects a sites ability to provide the identified housing need as outlined in the Council's adopted policy and local evidence
- To provide greater flexibility for London boroughs to determine the appropriate affordable housing tenure split having regard to locally identified need
- To recognise the particular circumstances of non-stock holding authorities and their reliance on Registered Providers (RPs) and nomination arrangements relating to low-cost rental products
- To remove (or make discretionary) the requirement for London boroughs to maintain intermediate housing registers and prioritise key worker living rent, allowing these matters to be determined according to local circumstances and identified need.
The Council acknowledges that there is some reference to potentially securing higher levels of affordable housing through early-stage review mechanisms ‘regardless of route,’ and where supported by evidence in local plans. However, these mechanisms are somewhat vague and do not remove the Council's concern that the proposed threshold could result in lower affordable housing provision on schemes where the sites viability and the existing Bexley approach would secure a higher level.
In particular, it is difficult to reconcile these lower thresholds with the draft Plan's wider ambition to maximise affordable housing delivery, the Mayor's aspiration for 50% of new homes to be affordable, Bexley’s local evidence of housing need and the Councils success in the current plan period of securing relatively high proportions of affordable housing from qualifying developments (41% since 2019/20).
In addition, to this, the proposed tenure split standard of 60% low-cost rent and 40% intermediate does not allow for a flexible approach to be taken where local policies and evidence support a different tenure split. Bexley's SHMA 2021, having considered local affordability and delivery levels, housing register data and household circumstances, concluded that a broad 70% low-cost rent/ 30% intermediate split remained appropriate. This is as reflected in the Bexley Local Plan policy approach and is particularly important given Bexley's status as a non-stock holding authority.
The Council relies on RPs to deliver and manage affordable housing and on nomination arrangements to ensure that new affordable homes contribute towards meeting the needs of households on the Council's housing register. A greater proportion of intermediate housing therefore does not necessarily provide the same benefit to Bexley in meeting its locally identified housing need and ensuring that affordable housing is provided to those that most require it.
The Council is also concerned that HN3 seeks to introduce a London-wide requirement for boroughs to establish intermediate housing registers and give priority to key workers. Bexley does not currently operate an intermediate housing register and does not consider that a universal requirement is justified, particularly given the lack of acknowledgment of the additional resource implications this would create for boroughs. The Council has also previously raised concerns regarding the key worker living rent product, considering that a housing product targeted primarily at particular occupations risks operating more as an economic policy, rather than a housing policy directed towards those in greatest housing need. The Council therefore considers that boroughs should retain discretion over whether and how key worker living rent is used to respond to local circumstances.
Overall, the Council considers that HN3 is insufficiently flexible to reflect the significant differences between London's boroughs, each of which operate in their own distinct housing environments. The Council believes the proposed approach may reduce the delivery of affordable housing in Bexley and risks changing its tenure away from the forms most closely aligned with local need, whilst also constraining the Council's ability to determine the appropriate housing mix. As such, the Council therefore considers that HN3 requires further amendments.
14 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
HN4: Gypsy and Traveller accommodation
15 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
No
16 Answer Q16 only if you have chosen No for Q15. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
The Council recognises the importance of ensuring that the housing needs of Gypsy and Traveller communities are properly identified and met, and supports the provision of suitable, sustainable accommodation where there is an evidenced need.
However, the Council has significant concerns around the proposed minimum requirement for 39 additional permanent Gypsy and Traveller pitches in Bexley. The Council considers that the evidence does not sufficiently demonstrate that this figure represents objectively assessed, locally arising need, nor that it is realistically deliverable within the plan period.
The proposed requirement represents a substantial departure from the evidence underpinning the adopted Bexley Local Plan. The Bexley SHMA 2021, drawing on the local Gypsy and Traveller Accommodation Assessment (updated in 2021), identified four additional pitches to 2038 under the cultural definition of need, of which only 0.5 pitches represented need under the Planning Policy for Traveller Sites (PPTS) definition. As such, the Council is particularly concerned that a significant proportion of the 39-pitch figure appears to arise from the application of a London-wide assumption concerning Gypsy and Traveller households living in conventional housing stock, rather than from directly evidenced need within Bexley. In light of this, the Council does not consider that the presence of Gypsy and Traveller households living in conventional suburban housing stock can, without local evidence, be equated with an objectively assessed need or desire to move to pitch-based accommodation.
The Council is also concerned that the proposed target has not been demonstrated to be effective and deliverable. There is no identified pipeline of suitable sites capable of accommodating 39 additional pitches within the plan period and local understanding maintains that there is currently a limited demand for vacant pitches. The London Gypsy and Traveller Accommodation Needs Assessment (GTANA) itself recognises that significant land, funding and other constraints will impact the potential delivery of new sites across London. As such, the Council believes that the Greater London Authority’s London-wide evidence does not adequately demonstrate how the proposed scale of additional provision could realistically be delivered within Bexley.
The Council does not consider it appropriate for the proposed 39 pitches to operate as a minimum requirement and recommends that this is revised to reflect robustly evidenced local need and realistic deliverability.
In addition, the Greater London Authority should provide greater transparency around:
- The number and response rate of Bexley households represented in the London-wide survey that acted as evidence for the London GTANA.
- The number of Bexley households that actually expressed a need or desire to move to pitch-based accommodation.
- How cultural preference has been distinguished from objectively assessed accommodation need?
Any requirement should be reviewed against Bexley-specific evidence, existing provision, actual demand and the availability of suitable sites.
The Council considers the policy is not sufficiently justified, because the evidence does not adequately demonstrate that the pitches arising from the London-wide GTANA methodology based on survey evidence concerning households living in conventional housing stock constitute additional need specifically arising in Bexley.
The Council believes that the policy cannot be considered as positively prepared or effective, as there is insufficient evidence that the proposed 39 pitches can realistically be accommodated and delivered within Bexley over the plan period.
The Council considers that the final policy should establish a proportionate, locally evidenced and deliverable requirement, rather than imposing a minimum figure which has not been sufficiently demonstrated to reflect Bexley's actual circumstances.
17 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
HN5: Managing specialist accommodation
18 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
No
19 Answer Q19 only if you have chosen No for Q18. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
The Council has concerns that HN5 is not sufficiently sound in its current form. In particular, the borough-level requirements for supported, specialist and older persons’ housing units (Table 3.7) are based on modelled estimates of unmet need, rather than detailed local assessments of need.
The Council is also concerned that HN5 promotes Large-scale Purpose-built Shared Living (LSPBSL), for which there is no identified local need in Bexley and where the Council has a strong preference for self-contained housing.
The Council recommends that the figures in Table 3.7 of HN5 are treated as an indicative starting point, and that boroughs are able to refine them through their own local needs assessments and Local Supported Housing Strategies. The Council also recommends that the policy provides sufficient flexibility to reflect local need, existing provision and deliverability.
The Council also recommends that provision of LSPBSL is only supported where there is demonstrated local need and where it is appropriate, having regard to local housing need requirements and the availability of more effective forms of self-contained housing.
The Council notes that the ‘Supply and Demand for Supported Housing in London’ study itself states that its estimates are “not an exact science” and recognises that local knowledge and more detailed local assessments can refine the estimates. This is particularly relevant to Bexley given that the Council has started production on a Local Supported Housing Strategy in accordance with the Supported Housing (Regulatory Oversight) Act 2023. The Strategy will provide a more detailed assessment of existing provision and local need, including unmet need, and should provide a more appropriate basis for understanding Bexley's future supported housing requirements.
The Council is therefore concerned that the proposal in policy HN5 is for the figures in Table 3.7 to be treated as minimum requirements despite the underlying evidence recognising that the estimates can be refined through more detailed local evidence. The Council considers that the figures should instead provide an initial indication of potential need, with the final scale and type of provision informed by local evidence.
This is particularly important as local Adult Social Care evidence is already identifying specific gaps in Bexley, including longer-term supported housing for people with mental health needs and learning disabilities, transitional supported housing, and higher-level supported housing for people with physical disabilities. The Council considers that this local understanding of need should inform the implementation of HN5.
In addition, the Council also has concerns regarding the inclusion of LSPBSL in the policy. The Council has a strong preference for self-contained housing and has not identified a local need for this form of non-self-contained accommodation. The Council considers that its provision should therefore be based on demonstrated local need and circumstances rather than a general expectation of provision without regard to the local context.
Overall, the Council considers that HN5 is not currently sufficiently justified or effective and should be amended to allow borough-level evidence and local supported housing strategies to inform the scale and type of provision required.
20 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
HN6: Build to Rent
21 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
No
22 Answer Q22 only if you have chosen No for Q21. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
The Council has significant concerns around the proposed requirement for boroughs to continue to take a positive approach to Build to Rent (BtR), and that the presumption that such schemes are appropriate irrespective of local housing need, tenure requirements or site circumstances. This is particularly relevant to Bexley as a non-stock holding authority, where the Council is heavily reliant on Registered Provider partners and nomination arrangements to secure access to affordable low-cost rent housing for households on its housing register.
The Council considers that HN6 does not provide sufficient flexibility for boroughs to determine whether BtR is appropriate having regard to local circumstances, and that the proposed approach has not adequately considered its potential impact on the delivery of low-cost rental products in boroughs such as Bexley.
The Council recommends that HN6 is amended to provide boroughs with greater flexibility to determine whether BtR is appropriate, having regard to:
- Local housing need and affordable housing priorities – including the ability of the proposed affordable housing to meet identified local need
- The Council's status as a non-stock holding authority and reliance on nomination arrangements.
- The site-specific circumstances and contribution of the proposed development to overall affordable housing delivery.
The Council also recommends that the London Plan clarifies the intended application of HN6, including whether the policy is intended to apply to BtR developments below the previous London Plan threshold (developments that contained at least 50 homes).
If the threshold is being reduced, the Council considers that the interaction with HN3 should be explicitly reviewed, particularly in relation to the potential impact on the delivery of much-needed, low-cost rent housing delivery which non-stock holding boroughs can nominate to.
Unlike other local authorities, Bexley is dependent on its Registered Provider partners to provide and manage affordable housing in the borough and is hugely reliant on nomination arrangements to allocate to persons to low-cost rental housing to those on the Council’s housing register. As such, the Council's strategic priority is to maximise the delivery of low-cost rent housing to which the Council can nominate to.
In light of this, the Council has significant concerns regarding the proposed affordable housing component of BtR schemes, as it is noted that HN6 requires the affordable housing element to be provided through discounted market rent and key worker living rent homes, in accordance with HN3. Neither of these products are available to the Council to nominate to from its Affordable Housing Register.
The Council has previously raised concerns regarding Key Worker Living Rent (the more affordable component of the affordable requirement), considering that a housing product targeted primarily at particular occupations risks operating more as an economic policy than a housing policy directed towards those in greatest housing need (see HN3 response). This concern is particularly relevant in Bexley, which does not currently operate an intermediate housing register. The Council therefore considers that the policy does not allow for boroughs to determine the appropriate affordable tenure within schemes and does not have regard to local housing need and local nomination arrangements.
The proposed approach is particularly concerning when considered alongside HN3. Bexley falls within Location Band C, with a threshold affordable housing requirement of 20 per cent for schemes of 36 homes or more. HN3.3 also proposes a 20 per cent requirement for schemes of 10–35 homes on non-Green Belt land. The previous London Plan BtR approach applied where the development, block or phase contained at least 50 homes.
The Council therefore seeks clarification as to whether HN6 is intended to extend the BtR framework to smaller schemes. If so, smaller BtR developments could potentially fall within the BtR framework while also being subject to only a 20% affordable housing requirement under HN3. Where that affordable element is then required to comprise of key worker living rent and discounted market rent rather than low-cost rented housing, this could have a substantive, cumulative impact on both the level of delivery and tenure of affordable housing available to meet Bexley's locally identified needs.
The Council considers that this interaction between the two policies has not been sufficiently assessed and raises concerns regarding whether the approach is justified, particularly given the potential consequences for affordable housing delivery in boroughs with no council housing stock and which rely on nominations to Registered Provider managed affordable housing.
As such, the Council does not support an approach which treats BtR as inherently preferable to other housing delivery models.
23 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
HN7: Housing size mix
24 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
No
25 Answer Q25 only if you have chosen No for Q24. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
The Council has significant concerns regarding the proposed distinction between the evidential basis for affordable and market housing size mix. In particular, there are concerns that HN7 requires any local policy or supplementary guidance relating to market housing size mix to be based on the London Strategic Housing Market Assessment (SHMA), whilst allowing substantially greater reliance on local evidence in determining the appropriate mix of affordable housing.
The Council believes that HN7 should be amended to allow boroughs to have regard to robust local evidence when determining the appropriate size mix of market housing, particularly where a borough can demonstrate that its housing market and demographic circumstances differ materially from the London-wide position. The Council would also welcome consideration of a more flexible, location-sensitive approach to market housing size mix, comparable to the flexibility provided for affordable housing.
For Bexley, the Council considers that its locally evidenced requirement for a broad range of dwelling sizes, including a significant proportion of family-sized homes, should continue to inform the determination of market housing mix. This is particularly important given that the wider approach in the draft Plan under HN1 (3.20) recognises non-self-contained accommodation as contributing towards meeting general housing need in London and in borough housing targets. The provision of non-self-contained accommodation should not be treated as a substitute for ensuring an appropriate supply of self-contained housing of different sizes. The Council considers that this approach risks undermining the ability of boroughs to respond to materially different local housing market circumstances where robust, locally specific evidence demonstrates a different requirement.
This is particularly relevant to Bexley. The Council commissioned the 2021 Strategic Housing Market Assessment (SHMA) to provide the evidence base for the Bexley Local Plan and Housing Strategy and was tailored to the distinctive characteristics and needs of the borough. As such, this document identifies Bexley as a suburban housing market and concludes that there is a need for a broad range of dwellings, with particular emphasis on two and three bedroom homes, to ensure mixed and balanced communities.
This evidence informed the dwelling mix included in the Bexley Local Plan, which identifies a borough-wide requirement over the plan period for 34.5% 3-bed homes and 16.1% 4-bed homes. In addition, the need specifically for family housing of these larger sizes is even more pronounced when considering market housing on its own, where the identified mix is for 41% 3-bed homes and 21% 4-bed homes.
The Council is therefore concerned that the proposed reliance on London-wide evidence for market housing could conflict with Bexley's locally evidenced housing requirements and the housing mix established through the evidence base that has justified the Bexley Local Plan. Whilst it can be recognised that certain areas of London may have a significant requirement for smaller homes, this should not result in an assumption that the need for larger homes is insignificant in all parts of London and subsequently applied to all areas. The Bexley Local Plan evidence demonstrates a materially different position, particularly in relation to market housing. As such, the Council believes that appropriate weight should be given to local evidence when determining the mix of new homes.
This is also apparent in relation to the Council’s concerns around the wider approach in the Draft London Plan to non-self-contained accommodation, and the new recognition of non-self-contained accommodation as contributing towards borough housing targets. Whilst the Council does not object in principle to appropriate specialist or older persons’ non-self-contained accommodation where it clearly meets an identified need, it is concerned where such forms of accommodation are increasingly relied upon as part of meeting general housing need. The Council considers that this should not reduce the importance of securing a sufficient supply of self-contained housing in the borough, including family-sized homes that align with locally evidenced need.
In addition, the Council notes that the London SHMA itself identifies significant overcrowding amongst families with children - including 16.8% of families with children in social housing and 15.1% of families with children in the private rented sector. The Council considers that the latter finding is particularly relevant to the proposed approach to market housing, as it demonstrates that pressures arising from insufficient family-sized accommodation are not confined to the affordable housing sector. The Council therefore questions whether the proposed emphasis on smaller market homes adequately reflects the need to address overcrowding and provide a sufficient supply of family-sized accommodation across the housing market as a whole.
The Council is also concerned about the longer-term consequences of a sustained concentration of new development of smaller sized units and the impact that the longevity of the policy through the current plan period will have. This has the potential to change the composition of Bexley's housing stock for decades. A broad spectrum of dwelling sizes, along with types and tenures, is necessary to allow households to move through the housing market as their circumstances change and to avoid future households becoming constrained by an insufficient supply of appropriately sized homes.
26 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
HN8: Housing design
27 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
No
28 Answer Q28 only if you have chosen No for Q27. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
The Council notes a departure from, and a reduction in content of, the London Plan 2021 policy, which is a concern. Most notably, the requirement for applicants to “maximise the provision of dual-aspect dwellings and seek to minimise the provision of single-aspect dwellings,” rather than explicitly “avoiding the provision of single-aspect dwellings” as set out in the London Plan 2021, is disappointing.
Whilst this accords with the Mayor’s Support for Housebuilding LPG, the Council understood these to be emergency measures introduced to enable housing in the short-term, and the proposal to embed such changes within policy appears to fail to consider the potential long-term effects on Londoners.
Considering increasing temperatures being experienced in the capital given climate change, the Council is concerned about the repercussions of increased single-aspect homes that can lead to the poor physical and mental health and wellbeing of Londoners.
As written, the policy also fails to recognise the potential, cumulative negative impact on these single-aspect homes – such as the loss of daylight and sunlight – as new, neighbouring developments come forward – something that could be particularly problematic in proposed tall building clusters.
The draft policy focuses on single-aspect north- and south-facing homes, failing to address the overheating issues that can face single-aspect, west-facing homes, which is a significant concern.
The rationale for the proposed reduction of a minimum floor-to-ceiling height from 2.5m in the London Plan 2021 to 2.4m in the draft Plan is unclear, particularly as the policy anticipates an increase in single-aspect homes, whereby taller ceilings would be advantageous.
The Council notes with concern that the policy implementation text has reduced play provision within housing developments. Similarly, the draft Plan omits the useful implementation text provided in the London Plan 2021 regarding private outdoor space.
Part E of the policy addresses the long-term maintenance and servicing of the building and the Council notes that this focuses on external components of the building, including building materials. The Council suggests this should be expanded to account for the maintenance of a buildings’ internal services, including lifts and other mechanical and electrical systems.
The Council recommends that HN8 is amended to further emphasise that the provision of dual-aspect homes should be prioritised, and where single-aspect homes are proposed, it should be evidenced by applicants that this is necessary for site optimisation and that such homes will be of high-quality design and address matters such as internal cooling. The draft Plan should consider how high-quality design will be futureproofed and protected from the negative impact of neighbouring development to which single-aspect homes will be more sensitive.
The implementation text would benefit from explicit reference to how applicants can demonstrate that their proposal ensures passive ventilation, daylight and privacy, and avoids overheating. It is considered that the language used around this demonstration could be strengthened to state that applicants “must” demonstrate the aspects outlined, rather than “should.”
As there is further discussion of play provision within draft policy MBUL9, the Council recommends this policy is linked within HN8 to ensure a holistic approach to play in all contexts. It would also be useful to reintroduce implementation text regarding private outdoor spaces and the form these can take. This should include reference to the importance of outdoor activities for adults where possible, such as outdoor gyms and socialising spaces.
With regards to the maintenance and servicing of a building, the Council suggests that the policy emphasises the importance of this consideration from the outset and throughout the design process. Furthermore, inclusion of designing robust internal and external building systems such as vertical transportation, drainage, and fire suppression systems, should be included.
The Council has previously raised concerns that, where requirements for dual-aspect homes are being lessened, policy and guidance should be strengthened to assist the decision-making process and to ensure that development proposals are adequately mitigating against the potential negative effects of single-aspect homes during the design-process. This concern remains relevant where the draft policy shifts from “avoiding” single-aspect homes to “minimising” their provision whilst noting the requirement to optimise development sites. The consideration of overheating in (east) and west-facing single-aspect homes is often overlooked by applicants; therefore, explicitly stating the need to demonstrate adequate consideration for this would be beneficial in the decision-making process.
Whilst single-aspect homes are inevitable when delivering flatted developments, their provision must not be at the detriment of Londoners’ health and wellbeing both now, and in the future. The Council considers that the policy should be reviewed and strengthened in this context.
Including further implementation text on play and private amenity provision would benefit the design and decision-making processes, particularly in the latter whereby applicants fail to provide sufficient space, thus ensuring LPAs have adequate policy backing.
Noting requirements for long-term maintenance considerations to include building systems would be useful as these can have implications on tenants and residents where systems fail.
29 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
HN9: Accessible housing
30 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
Yes (see general comments section at Q38)
31 Answer Q31 only if you have chosen No for Q30. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
N/A
32 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
HN10: Burial Space
33 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
Yes (see general comments section at Q38)
34 Answer Q34 only if you have chosen No for Q33. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
N/A
35 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
Examination in public
36 If you are seeking any modification to the draft Plan, please confirm whether you would wish to appear at the Examination in Public, if requested to do so by the Inspector. If so, we will pass your details to the Inspector who will decide whether to issue a formal invitation to you at a later date. The Inspectors themselves would set the dates that the hearing would be held.
Yes
No
37 Answer Q37 only if you have chosen Yes to Q36. Please explain why you consider it necessary for you to attend the Examination in Public.
The Council raises concerns for some policies in this chapter as to whether they meet the ‘test of soundness’ (e.g. positively prepared, justified, effective and consistent with policies published within the revised National Planning Policy Framework).
General comments
38 If you have any general comments about any of the policies in this chapter, please record them here. Where you have a comment about a specific policy, it would help us if you could make clear which policy your comment relates to.
HN1 Increasing London's housing stock: The Council broadly supports policy HN1 and welcomes the adoption of a more realistic evidence base to inform borough housing targets. In particular, the Council supports the revised Strategic Housing Land Availability Assessment (SHLAA) methodology, which better reflects actual housing deliverability by incorporating site phasing, build-out rates, viability and market conditions. As such, this provides greater confidence that housing targets are based on realistic delivery assumptions rather than of theoretical capacity.
The Council also welcomes the continued prioritisation of brownfield development and notes that Bexley's proposed target of 6,217 homes is expected to be delivered entirely from brownfield land, consistent with the adopted Bexley Local Plan and the Council's approach to protecting the Green Belt.
However, the Council considers that the policy could better recognise the practical limitations on some London boroughs' ability to influence housing delivery. As a non-stock holding authority, Bexley relies heavily on developers and our key Registered Provider partners to deliver new homes, particularly affordable housing. Whilst local planning authorities play a critical role in enabling development through plan-making and decision-making, delivery is also heavily dependent upon market conditions, viability and investment by delivery partners.
The Council therefore recommends that there is more clearly acknowledgment of these wider delivery dependencies and commits to keeping the housing targets and SHLAA assumptions under regular review to ensure they remain realistic as market conditions evolve over the coming years.
HN3 Delivering affordable housing: From an operational perspective, the Council’s main concern is the increased emphasis on intermediate housing and the proposal for boroughs to operate an intermediate housing register.
At present, intermediate rent properties in Bexley are generally owned and managed directly by Registered Providers (RPs). The Council has very limited involvement in allocating these homes and does not currently operate an intermediate housing register. The draft Plan also does not appear to address the additional resource implications this would create for boroughs.
That said, greater visibility of intermediate housing opportunities could be beneficial. We are currently looking at introducing an earnings cap for households seeking to join the housing register and, in those circumstances, having oversight of available intermediate housing products would help us direct households towards alternative housing options that may be more realistic and achievable than social housing.
If this is the intended direction of travel, the Council considers the Plan needs to be much clearer about the respective roles of boroughs and RPs, particularly around eligibility, nominations, affordability assessments and allocations.
The proposed move from a 70/30 to 60/40 low-cost rent and intermediate split is also of concern. The greatest pressures continue to be experienced amongst households requiring genuinely affordable rented accommodation. As a non-stock holding authority, Bexley are heavily reliant on nominations to affordable rented housing provided by RPs. Any reduction in the affordable rented element of new developments is likely to have a direct impact on homelessness pressures, temporary accommodation demand and housing register demand.
The Council would make a similar point regarding Build to Rent (BtR) schemes. Allowing the affordable housing element to be delivered entirely through intermediate products risks reducing the supply of affordable rented homes available to households in greatest housing need.
HN5 Managing specialist accommodation: The Council notes that Bexley's Purpose Built Student Accommodation (PBSA) target is zero bedspaces within Table 3.6. The Council considers this to be consistent with the absence of an identified local requirement for PBSA and would not support an approach whereby the general policy requirement to take a positive approach to PBSA creates an expectation for provision in Bexley notwithstanding the borough-specific evidence.
The Council considers that any PBSA proposal in Bexley should therefore continue to be assessed against locally identified need and other relevant local development plan policies, rather than the general London-wide objective of delivering additional PBSA.
HN7 Housing size mix: In relation to housing mix, whilst the London wide evidence may point towards a greater need for smaller homes overall, this is not reflected in the demand the Council sees through either the homelessness service or housing register. Bexley’s biggest pressures continue to be around family sized accommodation, particularly 3- and 4-bedroom homes, and boroughs should retain flexibility to respond locally to evidenced housing needs.
HN9 Accessible housing: the Council supports the overall ambition of HN9 to increase the supply of accessible housing. The policy is broadly consistent with the Council's existing approach and locally identified housing needs.
Bexley's 2021 SHMA identified significant need for accessible housing and estimated that approximately 927 additional adapted properties would be required between 2018 and 2038, providing a strong local evidence base for robust accessibility standards. The Council therefore welcomes the proposed provision of M4(2) and M4(3) homes, including the requirement for M4(3) homes to be provided across a range of dwelling sizes. This is particularly important given local evidence of a shortage of larger wheelchair-accessible homes.
The Council also supports the protection and like-for-like tenure replacement of existing wheelchair-accessible homes. Feedback from the Council's Occupational Therapists highlights the importance of ensuring that accessible homes are not only technically compliant with M4 standards but are also genuinely functional, safe and suitable for their intended occupants. The Council would therefore welcome recognition within the policy guidance of the value of early involvement of Occupational Therapists and other relevant access professionals, particularly for bespoke wheelchair-accessible homes.
In addition, the Council would encourage the policy to recognise that accessible housing should not equate wheelchair accessibility with the whole spectrum of disability. Accessible and adaptable housing is also important for people with reduced mobility and balance difficulties, neurological conditions, cognitive impairments, learning disabilities and other long-term conditions that may affect an individual’s ability to access and use their home safely and independently.
The Council also considers that accessibility should be considered across the whole journey (including communal areas, entrances, parking, external routes and connections to local services and transport) rather than solely within the dwelling itself.
HN10 Burial space: this draft policy has carried forward the burial policy from the London Plan 2021, with evidence for retaining this approach set out within the updated Audit of Burial Space Provision report (2026). The Council already takes a proactive approach to burial provision based on the identification of need as demonstrated within the Bexley Infrastructure Delivery Plan. Therefore, there is no objection to this specific policy.
Chapter 4 Growing London’s economy in a way that benefits all
The focus of the Council’s response to this chapter is the need for greater recognition of Bexley's local economic, industrial and market circumstances, particularly where the Draft London Plan seeks to apply London-wide requirements that could affect the borough’s employment land, industrial capacity and ability to support locally important economic uses.
GLE1: Sufficient and appropriate employment space
6 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
No
7 Answer Q7 only if you have chosen No for Q6. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
Whilst the Council supports policy GLE1 and its overall objective of ensuring sufficient and appropriate supply of employment space to support London’s economy, the evidence underpinning the policy is relatively general and does not clearly demonstrate how the identified requirements apply at borough level or reflect local market conditions. The evidence base should be clear on what the Greater London Authority is seeking Bexley to deliver and how the policy should be applied, avoiding a uniform approach across London where local circumstances differ.
The Council supports the requirement in part A of GLE1 for local plans to have regard to London-wide and local assessments of supply and demand, and the flexible and adaptable approach to employment space set out in Part B of the policy.
The Council also supports part C of GLE1, which seeks to ensure that light industrial premises are appropriately designed to meet the operational needs of a range of occupiers. Part F of the policy is also supported in seeking to address the potential displacement of small and independent businesses through appropriate re-provision and/or relocation, where feasible and appropriate. The flexibility provided is welcomed, but greater clarity on how “feasible and appropriate” should be assessed would help ensure requirements are applied consistently and proportionately.
8 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
GLE2: Supply of industrial land
9 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
No
10 Answer Q10 only if you have chosen No for Q9. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
The Council objects to policy GLE2, particularly its provision for the strategic-scale release of Green Belt land within identified Broad Locations for Growth (BLGs) to meet industrial and storage and distribution needs. The Council considers this approach to be unjustified, ineffective and inconsistent with national policy, as the evidence does not demonstrate that Green Belt release is necessary to meet the identified industrial land requirement in Bexley given the borough's substantial supply of vacant industrial land.
The approach to policy GLE2 would also appear to conflict with the rationale for the policy which is put explained in paragraph 4.27. This paragraph states that many sectors require close and timely access to their supply chain, along with access to storage for goods and materials, and access to customers. Working on this basis, the paragraph follows that ‘London is too large to be serviced sustainably solely from its periphery or from outside its boundaries.’ Therefore, given LB Bexley’s location as an outer London borough, which is on the periphery, would the release of Green Belt in this area (as suggested in policy PV5 within the creation of BLG 70) really be considered as sustainable for the purposes identified? Given the fact that LB Bexley has an identified level of vacant industrial land within the borough at present, which can both accommodate, and provide for more than the assumed projections, the Council would query the imposed need for LB Bexley to accommodate even more and specifically with that level of accommodation being identified within the Green Belt.
The Council supports strategic collaboration between boroughs within a Property Market Area (PMA), as reflected in parts A and B of policy GLE2. However, greater clarity is required on how the PMA approach to collaborating and pooling respective capacities, and the planning for re-provision of capacity (in advance of any release elsewhere within any other London borough within the wider PMA) will operate in practice. Boroughs within the Thames Gateway PMA are not homogeneous, with differences in market demand, accessibility, infrastructure, land values, site availability and industrial specialisms affecting the extent to which capacity in one borough can meet demand elsewhere.
Also, due to LPAs within each PMA being at different stages within their own individual plan-making processes, how does the Greater London Authority consider that discussions regarding planning for the re-provision of capacity would be workable? In the event that re-provision could be/is agreed, LPAs would have no control over the acceptability of such changes due to the requirement of any changes in land-use designation being assessed through the formal examination of a Local Plan, where any issue/s could arise either at consultation stage, or through the Examination in Public (EiP) itself.
The relationship between London-wide industrial need, PMA-level requirements and the specific locations identified for Green Belt release is also unclear. Part A of policy GLE2 establishes storage and distribution benchmarks on a PMA basis, while Part B of the policy refers to pooling capacity within the PMA. However, part E of the policy does not clearly establish whether Green Belt release at a particular BLG is intended to meet the relevant PMA requirement or wider London-wide needs. This reasoning behind the approach is also not clear within policy PV5 (industrial land supporting housing growth).
The Plan should clarify this relationship and demonstrate how the need for release at each BLG has been derived. Further justification is also required for the continued use of the PMA boundaries, given changes in logistics patterns, infrastructure, economic conditions, industrial demand and land values since the evidence underpinning the boundaries was prepared.
The Council is also concerned that the industrial land shortfall has not been demonstrated with sufficient certainty to justify Green Belt release. The evidence identifies vacant industrial land, repurposing and intensification as potential sources of additional capacity, but acknowledges uncertainty over the contribution these can make. The supporting evidence does not quantify the potential contribution from repurposing surplus B2 land or industrial intensification. The Plan should therefore demonstrate clearly how these sources have been considered before relying on Green Belt release.
For Bexley, the evidence identifies 50.58 ha of vacant industrial land, compared with a projected requirement for approximately 30 ha of storage and distribution land to 2050, but no additional requirement for general industrial, light industrial or R&D land. Whilst the Council recognises that vacant land may not necessarily be suitable or deliverable for this purpose, the evidence should clearly identify what proportion of this vacant capacity is considered unsuitable or unavailable for storage and distribution, for what reasons, and why any resulting residual requirement cannot reasonably be accommodated within existing industrial locations before Green Belt release is considered at BLG 70.
Following on from this, it is noted that Table 4-6 of the Economic and Infrastructure Supply and Demand Study indicates that out of all boroughs, Bexley contributed the most to average annual net completions of R&D, light industrial, general industrial and storage and distribution floorspace within London. Across all industrial uses, the figure for Bexley was 13,525m2. Bexley, whilst not only being the greatest figure/contributor in London, was also only one of only six boroughs to have a positive relative rate of change.
Given Bexley’s strong and positive contribution to net completions across London, coupled with the level of vacant industrial land which the borough holds it is considered that this would be another reason to reassess consideration of development in Bexley through BLGs.
The Council notes that the evidence itself acknowledges uncertainty in the projections and the assumptions underpinning them. Without this robust basis it would be premature to identify that Green Belt release is necessary.
This is relevant to the soundness of the draft policy, as it should be consistent with NPPF policy GB3 that requires exceptional circumstances for Green Belt boundary changes to be fully evidenced and justified. GB3 requires all other reasonable options for meeting an identified need to be examined, including suitable previously developed and underutilised land, optimising development density and suitable sites outside the Green Belt.
Policy GLE2 should operate consistently with this approach. The draft Plan should therefore demonstrate that these options have been properly considered and that any residual industrial land requirement is sufficient to justify strategic-scale Green Belt release. Where release is proposed, each location should also be justified having regard to Green Belt purposes, infrastructure, environmental and transport impacts, existing concentration, and the operational requirements of the proposed industrial uses.
Greater clarity is needed on the precise extent and location of the BLGs, which are not possible to identify from the current large-scale mapping.
The Council is also concerned that the focus on meeting additional storage and distribution requirements could displace Bexley’s established manufacturing, construction, servicing and other industrial uses, which provide important local employment. B8 uses can occupy large areas of land while providing fewer local employment opportunities. The Plan should therefore ensure that land supporting Bexley’s wider range of local industries and employment opportunities is not displaced in favour of strategic storage and distribution uses.
Without greater specificity regarding the need to be met, there is a risk that identifying BLGs could provide a basis for speculative industrial proposals that are not clearly linked to an evidenced local or PMA-level requirement.
In this regard, the Council would draw attention to what appears to be the creation of an ‘Industrial Collaboration Working Group’ which is referenced within paragraph 4.23 of the policy implementation text. The implementation text explains that this group, for plan-making authorities, will facilitate and coordinate the meeting of needs on a PMA basis, including that of additional needs that are likely to arise from industrial release (as a result of the aims of draft policy PV5 which covers industrial land supporting housing growth). There is no other reference to the working group within the draft Plan, nor any explanation of what level or capacity of engagement is required. The working group may add additional burdens to plan-making authorities, so this matter requires further explanation regarding its management and operation.
The Council supports the protection of SIL and LSIS. However, part F of policy GLE2 should retain sufficient flexibility to allow industrial areas to accommodate evolving employment needs and compatible uses without resulting in a loss of industrial capacity.
Please see the Council’s full responses to policies MBUL1, PV5 and PV7 as these directly relate to the response to policy GLE2.
11 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
GLE3: Data centres
12 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
No
13 Answer Q13 only if you have chosen No for Q12. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
The Council calls into question both the soundness of the evidence on which the policy is based and the use of its findings. Therefore, the evidence does not support the policy approach.
The evidence note has not been sufficiently researched and conclusions within the evidence note are partially based on factually incorrect data about the borough of Bexley. The note itself concludes that both geographical constraints and access to resources will limit the number of suitable locations for constructing data centres across London as a whole.
As the note identifies, there are competing land use designations within London. The evidence note incorrectly suggests a direct link between the availability of industrial land and the suitability of that land to cater for data centres. Bexley has been identified within the evidence note as one of the boroughs that has some of the highest industrial land vacancy rates and therefore there is a suggestion that the industrial land holds potential for future data centre development even through the Greater London Authority’s own evidence appears to have earmarked this for B8 storage and distribution. Industrial land within the borough has been dedicated for true industrial uses that generate and sustain employment levels. The automatic assumption that such land is suitable for locating data centres and their associated infrastructure goes against the purpose of this key designation and would conflict with draft London Policy assumptions for employment uses.
14 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
GLE4: Night-time economy
15 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
No
16 Answer Q16 only if you have chosen No for Q15. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
The Council supports the overall objective of policy GLE4 to protect and promote London’s night-time economy, including its emphasis on growth and diversification. The Council considers that GLE4 provides a stronger framework for protecting the night-time economy than the NPPF and that this additional protection is justified given the sector’s economic, social and cultural role.
However, it is important that boroughs have the freedom to take into account local circumstances when determining what might be appropriate within their town centres and the policy approach needs to be suitably flexible in its approach.
Bexley has a more limited night-time and cultural offer than many Inner London boroughs, with evidence identifying approximately 26,030m2 of pub and bar floorspace, three nightclubs (all within Bexleyheath town centre), four theatres, and two cinemas (Cineworld Bexleyheath and Castle Sidcup). Whilst there are no specific music venues, live music is licenced at events.
The Council supports the principle of protecting valued public houses due to their important social, economic and community role and Bexley’s relatively limited provision. However, greater clarity is required at parts A(6), B(4) and B(5) of policy GLE4 in terms of the definition of ‘heritage, economic, social or cultural value to local communities’ and the circumstances in which protection should apply. Clearer definitions would help avoid uncertainty and inconsistent application across boroughs.
The policy should also ensure that protection of valued pubs does not constrain the growth and diversification of the night-time economy. Protecting existing valued pubs should be complementary to, rather than a substitute for, supporting new night-time uses and activities in appropriate locations.
17 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
GLE5: Culture and creative industries
18 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
No
19 Answer Q19 only if you have chosen No for Q18. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
The Council supports the overall objective of GLE5 to protect and promote London’s cultural infrastructure and creative industries, including the protection and enhancement of existing and new cultural provision. The Council supports GLE5(A)(2), which states that boroughs should consider requiring the replacement of a facility where the loss of a cultural facility or use is unavoidable. GLE5(D) sets the specific requirement for at least an equivalent amount of cultural space with similar affordability. Paragraph 4.55 also encourages consideration of continuity of use, the existing operator and user group.
The Council considers that some flexibility should be allowed in the form of replacement to respond to local cultural need and viability, rather than requiring a strict like-for-like approach. However, this flexibility should not result in replacement space being less affordable than the existing provision, as this could undermine the public benefit of the existing provision. This is relevant to Bexley as the Council seeks to strengthen and diversify its cultural offer, and where alternative forms of cultural provision may better meet local needs.
The Council also recommends that the Cultural Infrastructure Map and supporting evidence are reviewed and corrected, given the policy’s reliance on the Map to inform planning decisions, as the current data contains factual inaccuracies regarding Bexley’s cultural provision.
20 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
GLE6: Visitor infrastructure
21 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
Yes (see general comments section at Q47)
22 Answer Q22 only if you have chosen No for Q21. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
N/A
23 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
GLE7: Affordable workspace
24 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
Don’t know
25 Answer Q25 only if you have chosen No for Q24. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
N/A
26 If you have answered ‘Don’t know’ and want to explain why, please do so.
The Council supports the overall objective of policy GLE7 and recognises the role of affordable workspace in supporting SMEs, start-ups, creative industries and local employment. The Council welcomes flexibility to provide workspace off-site or through payments in lieu where on-site provision is not feasible.
The Council considers that the application of the requirements to schemes that replace, modernise or intensify existing employment premises should be addressed through local plans, including whether these requirements apply only to net additional floorspace. In Bexley, the renewal and intensification of existing employment and industrial areas is important to maintaining employment land and supporting industrial and logistics functions. Requirements should therefore not make such development less viable or discourage investment.
The relationship between parts D and E of policy GLE7 should also be clarified to ensure existing affordable workspace re-provided through redevelopment is properly accounted for when calculating any additional requirement, avoiding double counting.
GLE8: Access to employment and skills
27 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
Yes (see general comments section at Q47)
28 Answer Q28 only if you have chosen No for Q27. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
N/A
29 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
GLE9: Aviation
30 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
Yes (see general comments section at Q47)
31 Answer Q31 only if you have chosen No for Q30. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
N/A
32 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
GLE10: Safeguarded wharves
33 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
Don’t know
34 Answer Q34 only if you have chosen No for Q33. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
N/A
35 If you have answered ‘Don’t know’ and want to explain why, please do so.
Although The Safeguarded Wharves Demand and Capacity Study indicates that there will be a shortfall in wharf handling capacity over the London Plan period, policy GLE10 only aims to prevent the change of use of ‘safeguarded wharves’ to non-waterborne freight handling. Part A(2) does encourage the exploration of opportunities for new, expanded, or more efficient wharves in areas of ‘known deficiency’, this term is not defined and may mean that other opportunities are not explored. It might be assumed that any new wharves identified through this process would benefit from protection as part of a Safeguarded Wharves Review, but the Implementation text does not clarify this nor what protection might be afforded to these wharves before the next review takes place.
Whilst part D proposes that development proposals adjacent to or opposite safeguarded wharves should be designed to ensure that future freight use and capacity is not hindered, this is not specified as water-borne freight use and capacity should not be hindered. Also, care should be taken that materials in and out by road do not undermine the principal river-related function, which might lead to a reliance of trips by road resulting in a reduction in the use of the wharf itself for economic viability or other reasons.
GLE11: Circular economy
36 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
Don’t know
37 Answer Q37 only if you have chosen No for Q36. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
N/A
38 If you have answered ‘Don’t know’ and want to explain why, please do so.
The Council broadly agrees with the principles set out in policy GLE11, particularly the inclusion of strategic waste stream targets.
However, there are instances where the practicality of delivering on policy requirements is called into question. For example, paragraph 4.93 of the implementation text requires applicants for several development typologies to submit a Circular Economy Statement at pre-application stage. However, in reality it would be almost impossible to deliver as building(s) would not yet be developed to a sufficient level. The Council recommends this is reworded as a ‘Strategic CES,’ one that becomes finalised upon application submission.
GLE12: Waste
39 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
No
40 Answer Q40 only if you have chosen No for Q39. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
The Council has formed a joint waste planning group with its neighbouring southeast London boroughs and the City of London and it is within this region of London that the group would address the requirements of the Plan making section (parts A to D) of policy GLE12 along with part E(1) as this is also a plan making function. All member boroughs in the group are unitary waste authorities and address waste matters in their respective local plans.
Part A of the policy should specifically note that the principles of proximity and self-sufficiency should relate to each unitary waste authority (or combined waste authority) area, as these principles should be demonstrated in their waste plans. For Bexley, which is a unitary waste authority, its strategic waste policies sit within the Bexley Local Plan.
It is noted that the waste apportionment requirement for Bexley by 2040 is 513,000 tonnes (presumably per annum although this is not explicit) whilst the forecast arisings for the borough by 2040 are projected to be 429,000 tonnes per annum. The arisings forecast is 180% higher than the figure of 241,000 tonnes (at 2041) for Bexley in the 2021 London Plan; however, statistics from Defra’s waste data flow do not suggest such a significant increase over the past 14 years (data from 2010 to 2023) so it is not clear why Bexley’s waste arisings will increase so significantly.
Part B(1) of the policy apportions tonnages of waste capacity, by borough, for household and commercial and industrial waste streams, with part B(2) including a requirement for no net loss in capacity of strategically important waste management. ‘Strategic’ waste management capacity is then defined in paragraph 4.101 with a short list of facility types that has not included energy from waste facilities, which are likely to have large, licenced capacities that contribute significantly to preventing waste going to landfill.
However, these waste streams for CD&E and hazardous waste streams, which have been included in Part B(2) of the policy are not monitored, with the supporting text at paragraph 4.103 noting that waste planning authorities “should ensure that their plans seek to meet the demand for waste streams that are not apportioned.” However, privately owned and operated facilities can sell capacity to demand coming from anywhere and it would be inappropriate set a principle of no net loss for such facilities. It is also not appropriate for the same reason to protect existing waste sites that are not identified as strategic in waste plans (or local plans) as these are not being identified as necessary to meet the waste apportionment requirement and will unnecessarily protect a site when it could be repurposed for competing land uses needed for sustainable growth. Therefore, part E of the policy should relate only to strategic sites.
Part C(2) should not include LSIS (locally significant industrial sites) as appropriate locations for the management of waste, as LSIS are traditionally smaller and often located within town centres and residential areas. Many LSIS already co-locate with other land use functions that may suffer detrimental impacts from the inclusion of a waste facility within the site.
It is considered that Part D(1) of the policy is not effective. If a waste site is identified for release in a development plan because it is surplus to requirements and a change in the land use would allow for a competing land use that is also necessary for good growth (e.g. for housing), that should be tested at local plan examination as a contributor to sustainable development as part of the whole plan. The policy requirement for the site to be offered to other boroughs that have not yet met their apportionment targets could hold up the adoption of a local plan that in other regards would be considered sound. It is important also not to conflate the London Plan’s theoretical ‘apportionment’ of waste capacity across London with the actual collection and disposal of waste, which should be based on (and not undermine) the proximity principle.
London boroughs that are unitary waste authorities and are pooling their waste apportionment requirements through a ratified agreement or are not unitary but part of a combined waste authority that produces a waste development plan for the partner boroughs, should be the trigger for boroughs to work together to address surplus and deficiency in capacity.
41 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
GLE13: Aggregates and mineral resources
42 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
Don’t know
43 Answer Q43 only if you have chosen No for Q42. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
N/A
44 If you have answered ‘Don’t know’ and want to explain why, please do so.
Bexley has no land-won aggregate apportionment and is therefore not directly subject to the landbank requirements in Part A.
The Council notes that the evidence base, including the London Aggregates Assessment, identifies Bexley’s existing contribution through safeguarded Thames wharves, imported aggregates, safeguarded mineral resources and secondary aggregate production. This role should be more clearly reflected in the supporting text to policy GLE13 to ensure the policy accurately reflects the evidence base and London’s wider aggregate supply network.
The continued safeguarding and operational viability of Bexley’s aggregate wharves is important to London’s supply resilience and supports water-based freight. Bexley’s safeguarded sand and gravel resources should also be protected as a potential future source of supply, alongside recognition of secondary aggregates, including IBA aggregate from Cory’s Riverside Energy from Waste facility in Belvedere.
Examination in public
45 If you are seeking any modification to the draft Plan, please confirm whether you would wish to appear at the Examination in Public, if requested to do so by the Inspector. If so, we will pass your details to the Inspector who will decide whether to issue a formal invitation to you at a later date. The Inspectors themselves would set the dates that the hearing would be held.
Yes
No
46 Answer Q46 only if you have chosen Yes to Q45. Please explain why you consider it necessary for you to attend the Examination in Public.
The Council raises concerns for some policies in this chapter as to whether they meet the ‘test of soundness’ (e.g. positively prepared, justified, effective and consistent with policies published within the revised National Planning Policy Framework).
General comments
47 If you have any general comments about any of the policies in this chapter, please record them here. Where you have a comment about a specific policy, it would help us if you could make clear which policy your comment relates to.
Errors
- BLG 70 in Annex C shows an error in the associated Strategic Road Network references
- BFOA 30 is shown on Diagram 4.1 but is not identified in the accompanying key.
Supporting comments
GLE6: Visitor infrastructure: The Council supports policy GLE6 and considers that the policy provides an appropriate framework to strengthen London's visitor economy and support visitor infrastructure in sustainable locations across the capital, including outer London boroughs. The policies support for serviced visitor accommodation in town centres, high streets and other accessible locations aligns with Bexley’s own objectives to support economic growth, town centre vitality and regeneration.
As demand for visitor accommodation varies between outer London boroughs, the flexibility provided by paragraph 4.59 to have regard to local evidence on demand and supply, market conditions and development monitoring is particularly helpful. This allows Bexley to respond to its own circumstances and demand rather than applying a uniform approach to visitor accommodation across London.
GLE8: Access to employment and skills: the Council supports Policy GLE8, in particular, its aim of securing good-quality employment, apprenticeships, training and skills development opportunities for Londoners through major development. The policy appropriately recognises the importance of maximising opportunities for Londoners who are out of work or under-employed, as well as increasing access for under-represented groups in the labour market.
The Council welcomes the emphasis on reciprocal arrangements between boroughs, enabling residents to access opportunities across London and complete training and apprenticeships across multiple development sites. This is valuable for Bexley, where development opportunities are more limited than in some other boroughs. Cross-borough working could therefore provide Bexley residents with access to a wider range of employment, apprenticeship and training opportunities.
GLE9: Aviation: As Bexley does not have an airport, the policy has limited direct relevance to the borough. However, the provisions relating to Advanced Air Mobility (AAM) may become relevant to Bexley in the future given the borough’s industrial, logistics and strategic riverfront location. The Council therefore supports the policy’s approach to ensuring that any future AAM proposals are assessed against robust criteria, including potential environmental, transport, public health and cumulative impacts. As the technology and regulatory framework evolve, the policy and supporting guidance should be kept under review, with London-wide guidance developed if AAM becomes more prevalent.
Chapter 5: Creating a greener, healthier and resilient city
The focus of the Council’s response to this chapter is the need to strengthen environmental protections and climate resilience, while ensuring that London-wide standards allow sufficient flexibility to reflect Bexley’s local circumstances, evidence and infrastructure constraints.
GHR1: Energy efficiency
6 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
Yes (see general comments section at Q41)
7 Answer Q7 only if you have chosen No for Q6. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
N/A
8 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
GHR2: Low-cost low-carbon heat
9 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
Yes (see general comments section at Q41)
10 Answer Q10 only if you have chosen No for Q9. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
N/A
11 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
GHR3: Whole life-cycle carbon
12 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
Yes (see general comments section at Q41)
13 Answer Q13 only if you have chosen No for Q12. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
N/A
14 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
GHR4: Heat risk
15 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
No
16 Answer Q16 only if you have chosen No for Q15. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
This policy builds on current London Plan Policy SI4 Managing heat risk. The Council welcomes the recognition of the contribution green infrastructure makes to mitigating against the urban heat island effect. This is an approach that is already supported within Bexley Local Plan policy SP14.
However, the Council considers that Part B of the draft policy could be strengthened to result in more robust building solutions that will futureproof all buildings to be more climate resilient. As such, passive design approaches should be a requirement for all applications, with the policy stipulating that major applications ‘must’ demonstrate how the design maximises passive design measures and minimises energy use associated with cooling, whilst all schemes ‘should’ prioritise this approach. A stronger position here would benefit Londoners to live more comfortably in the long-term and supports decision makers in assessing proposals.
17 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
GHR5: Flood risk and drainage
18 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
No
19 Answer Q19 only if you have chosen No for Q18. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
The Council welcomes the strong emphasis on managing surface water runoff and reducing pollution. However, the Council considers that amendments are necessary to ensure that the policy is clear and effective. Policy GHR5 may not be effective as drafted for the following reasons:
Part B(2) of the policy requires referable development to aim to achieve greenfield runoff rates. The Council considers that this requirement should apply to all development, as a significant amount of development will not meet the definition of referable development but can nevertheless have implications for surface water runoff and flood risk. In addition, the requirement should be strengthened by replacing ‘aim to achieve’ with ‘should achieve.’ The Council considers that all development should achieve greenfield runoff rates, to ensure that development makes an effective contribution to managing surface water runoff and reducing flood risk.
The policy does not explicitly state that surface water should not be discharged to the foul sewer. While the drainage hierarchy does not identify discharge to a foul sewer as an acceptable option, the Council considers that this should be made explicit within the policy. Surface water should not be discharged to the foul sewer, as this can increase pressure on the foul drainage network and contribute to sewer flooding and pollution. An explicit policy requirement would provide greater clarity and ensure that this approach is consistently applied to development proposals.
The Council considers that the policy would benefit from clearly recognising other sources of flood risk, including fluvial and tidal flood risk, where relevant. The Council notes that flood risk is addressed through the National Planning Policy Framework and does not consider that GHR5 needs to duplicate national policy. However, given the title and scope of GHR5, the supporting text should more clearly recognise the relationship between the management of surface water, water quality and the wider management of flood risk.
This would provide a more comprehensive approach to flood risk within the London Plan, while avoiding unnecessary duplication of the flood-risk requirements already established through national policy.
20 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
GHR6: Trees, biodiversity and geodiversity
21 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
No
22 Answer Q22 only if you have chosen No for Q21. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
The Council supports the overall objectives of Policy GHR6 to protect and enhance trees, biodiversity and geodiversity and to support nature recovery. However, the Council considers that some amendments would improve the clarity and effectiveness of the policy and provide an appropriate strategic framework for boroughs to apply through their local plans.
The Council supports the proposed protection of sites of importance for nature conservation (SINCs) and the use of a mitigation hierarchy where development would affect a SINC. However, the Council considers that the application of Part D(1) would benefit from further clarification. The policy states that where harm to a SINC is unavoidable, and where the benefits of the development proposal clearly outweigh the impacts on biodiversity, the mitigation hierarchy should be applied.
The first part of this assessment concerns whether harm to the whole SINC is unavoidable. The Council considers that the supporting text should clarify how this assessment is intended to operate. Consideration of the need for the development and the availability of suitable alternative locations or solutions forms an important starting point in establishing whether harm to the SINC is unavoidable. Bexley Local Plan Policy DP20 provides locally specific criteria for designated sites, including consideration of ‘reasonable, less damaging, alternative solutions, locations or sites.’ The Council considers that the London Plan should clarify this principle at the strategic level.
The second part of the initial assessment concerns whether the benefits of the development proposal clearly outweigh the impacts on biodiversity. The Council considers that the balancing test should make clear that the benefits of development must be assessed against the particular features and ecological functions that make the affected SINC valuable for nature conservation. The contribution of a proposal to meeting housing requirements or other development needs should not, in itself, be taken to demonstrate that the benefits clearly outweigh the impacts on the biodiversity features and ecological functions of the affected SINC.
Part B of the policy states that development proposals should deliver new tree planting where possible while Part C states that existing trees of value should be retained wherever possible. The Council recognises that this approach is broadly consistent with national policy. However, greater clarity is needed regarding the circumstances in which it is concluded that retention or planting is not possible.
The policy should require applicants to demonstrate that reasonable alternative layouts, designs and construction methods have been considered before concluding that tree retention or new planting is not feasible. This would ensure that the qualifications “where possible” and “wherever possible” do not result in tree retention or planting being discounted without sufficient justification.
Finally, the Council welcomes the clarification of tree value as set out in footnote 85, especially the reference to trees being considered as holding importance for biodiversity value. It is important that this aspect of the definition be carried forward into future iterations of this document as it works its way through to final publication.
23 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
GHR7: Green infrastructure and Urban Greening Factor
24 Do you consider that, in overall terms, the Chapter or policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
Yes (see general comments section at Q41)
25 Answer Q25 only if you have chosen No for Q24. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
N/A
26 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
GHR8: Accessible green space
27 Do you consider that, in overall terms, the Chapter or policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
No
28 Answer Q28 only if you have chosen No for Q27, In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
The Council objects to the proposed modifications to ‘public green space categories and access criteria’ in Table 5.2, specifically the reduction in the minimum size threshold for Small green spaces from 0.4 hectares to 0.2 hectares and the introduction of a 200-metre proximity criterion.
The Council considers that, as currently drafted, Policy GHR8 is not sufficiently justified, effective or consistent with national policy and guidance, as it does not provide sufficient flexibility for locally derived size and accessibility standards where these are supported by robust local evidence.
The Council considers that the following amendments are necessary:
- The 0.4-hectare threshold between Pocket and Small green spaces should be reinstated.
- Policy GHR8 should explicitly allow boroughs to apply locally derived size and accessibility standards for the categories in Table 5.2, where justified by robust local evidence.
- The policy should recognise that the 0.5 hectare Natural England Doorstep Greenspace Standard (section 4) is an appropriate minimum benchmark for Small green spaces, particularly in outer London.
The Council considers that a 0.2-hectare minimum size is insufficient to ensure that a Small green space has enough physical capacity to provide a meaningful range of recreational, social, ecological and environmental functions. While the Greater London Authority 's Open Space Policy Mechanism Review states that spaces of 0.2 hectares can start to provide a multifunctional offer, the Council considers that a 0.4-hectare minimum provides greater capacity for multifunctional provision and is more appropriate in the context of Bexley's local circumstances and evidence base.
The Bexley Green Infrastructure Study (2020) identified a locally appropriate 280-metre accessibility standard for Small Local Spaces, based on the borough's open space network and local evidence.
In Bexley, the Council is concerned that the proposed combination of a 0.2-hectare minimum and 200-metre catchment could result in development technically meeting the size and accessibility requirements of the hierarchy through the provision of very small green spaces, without having sufficient physical capacity to provide a meaningful range of multifunctional uses to meet the needs of local communities.
The Council considers that the London Plan policy should provide sufficient flexibility for Bexley to retain its locally evidenced approach. This would be more consistent with the NPPF 2026 plan-making policy HC1: Planning for healthy communities, which requires development plans to set standards for different types of recreational land and facilities drawing upon relevant national standards and best practice, tailoring these as necessary to local circumstances and evidence.
The Council therefore considers that the proposed 0.2-hectare threshold should not be applied as a fixed London-wide size threshold where robust local evidence supports a different approach. In Bexley, retaining the 0.4-hectare threshold and locally derived 280-metre accessibility standard would provide an appropriate evidence-based approach.
The Council therefore recommends reinstating the 0.4-hectare threshold and amending Policy GHR8 to make clear that boroughs may apply locally derived size and accessibility standards, where justified by their evidence base.
29 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
GHR9: Clean and healthy waterways
30 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
No
31 Answer Q31 only if you have chosen No for Q30. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
The Council supports the overall objective of GHR9 to improve the quality of London's waterways. However, the Council considers that some amendments would improve the clarity and effectiveness of the policy.
The Council considers that the current wording may fail to meet the effectiveness test of soundness, as it does not provide a sufficiently clear requirement to prevent misconnections. Part B(2) of the policy states that new development should "take action to minimise the potential for misconnection between foul and surface-water networks." The Council considers that this wording should be strengthened. Given the contribution that misconnections can make to pollution of waterbodies, the policy should require new development to avoid misconnections and ensure that foul and surface-water drainage networks are correctly connected. Where misconnections are identified within or directly associated with a development and are within the control of the development, these should also be remedied.
Some of the terminology should be amended at paragraph 5.98 to ensure that the supporting text is accurate and clear. The paragraph refers to waterways when describing a range of features including lakes and ponds. The Council considers that the term ‘waterbody’ would be more accurate and technically appropriate as not all of the features referred to are waterways. This would also provide greater consistency with the terminology used in the Water Framework Directive and the National Planning Policy Framework. In addition, where the paragraph refers to the tributary network of the River Thames, the word tributaries should be used rather than tributary as the Thames has multiple tributaries.
32 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
GHR10: Air quality
33 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
Yes (see general comments section at Q41)
34 Answer Q34 only if you have chosen No for Q33. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
N/A
35 If you have answered ‘Don’t know’ and want to explain why, please do so.
N/A
GHR11: Cycle and car parking
36 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
Don't know
37 Answer Q37 only if you have chosen No for Q36. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
N/A
38 If you have answered ‘Don’t know’ and want to explain why, please do so.
The principle of maximising cycle parking and minimising car parking is being continued, with an increase in minimum parking for cycles and a decrease in maximum car parking standards. The car parking standards vary depending on the character setting and the Sustainable Access Measure (SAM) for any given area, with Bexley mainly sitting in setting A (predominantly outer suburban) and SAM levels 2, 3 and 4. This results in maximum car parking standards of between 0.8 and 0.4 spaces per dwelling in most areas with lower standards or car free in some locations, including brownfield first opportunity areas (BFOAs) and major town centres. The current London Plan allows a broader range – up to 1.5 spaces per dwelling in areas with the lowest PTALs - and makes a distinction in certain areas between larger and smaller units.
The Council fundamentally disagrees with the proposed approach to parking in the draft London Plan as it ignores the specific challenges faced by outer London boroughs regarding connectivity and looks to impose a one size fits all across large areas of the capital. In response to a similar approach in the current London Plan, the Council succeeded, despite TfL objections, in securing local variations in standards in its current adopted Bexley Local Plan and will look to do so again should the proposed approach be maintained, particularly as further significant reductions in maximum standards are planned.
However, it is considered that a more reasonable and justified approach would be to allow for these local variations in the London Plan in the first instance. Although the introduction of character and SAM measures do allow for some granularity, they are still considered to be overly generic whilst the associated standards do not acknowledge the reality of suburban living.
There are also concerns that deriving values for connectivity from TfL’s SAM approach means that some local services and facilities are not fully considered and some travel behaviours discounted or underrepresented, which may exaggerate the true connectivity level in Bexley with its paucity of public transport and more semi-rural areas meaning that community facilities are wider spread. These inappropriate assumptions have significant effects on development standards with some areas seeing drastically reduced maximum parking standards as compared to the current policy position and leading to a situation which would be entirely untenable given local conditions.
To ensure that the connectivity of development sites is not so constrained that it frustrates good growth and/or results in adverse effects on existing residents and businesses, local connectivity assessment using a variety of established/accepted methodologies (such as the DfT Connectivity Tool and PTAL) would clearly be more appropriate than the TfL SAM levels and align with the proposed policy at MBUL5.
Moreover, any associated standards should acknowledge the importance of parking to family housing. Evidence gathered for the Bexley Local Plan confirmed that the availability of adequate parking is an important factor in the demand for such dwellings and developers' decisions to build them in certain areas. As the majority of local housing need is for family units this is a significant consideration in addressing this requirement. The nature of suburban development means that local facilities are not concentrated but dispersed across an area. Public transport cannot effectively or practically cater for travel demands which require visits to a variety of locations outside of town centres, such as schools, nurseries, doctors, dentists and some employment centres. In the absence of a wide range of public transport choices and a highly concentrated pattern of land uses, the car is often the only option when making everyday trips with young children in outer London.
Where residents have no choice but to accept housing with inadequate on-site parking, it does not prevent them from owning a car. This then results in increased parking stress within an area, narrowing roads, reducing highway safety and making active travel less appealing. Extended parking restrictions, although effective in some instances are not the solution in all cases. They often only displace parking elsewhere and are unpopular with residents, resulting in objections to traffic management orders and the abandonment of schemes, making reliance on them in the planning context highly problematic. In these circumstances the only practical option is to acknowledge the need, in certain situations, to allow for the ability to flex the maximum standards, having looked at all practical ways of reducing car use.
In terms of cycle parking for Bexley, the standard is shown at Band 4, the same as most of outer London, even though Bexley has challenges for local cyclists compared to other outer boroughs owing to local topography as well as the minimal number of constrained crossings over radial railway lines. Again, more flexibility is required to allow boroughs to respond to local circumstances and ensure the best approach is taken in the light of these.
Examination in public
39 If you are seeking any modification to the draft Plan, please confirm whether you would wish to appear at the Examination in Public, if requested to do so by the Inspector. If so, we will pass your details to the Inspector who will decide whether to issue a formal invitation to you at a later date. The Inspectors themselves would set the dates that the hearing would be held.
Yes
No
40 Answer Q40 only if you have chosen Yes to Q39. Please explain why you consider it necessary for you to attend the Examination in Public.
The Council raises concerns for some policies in this chapter as to whether they meet the ‘test of soundness’ (e.g. positively prepared, justified, effective and consistent with policies published within the revised National Planning Policy Framework).
General comments
41 If you have any general comments about any of the policies in this chapter, please record them here. Where you have a comment about a specific policy, it would help us if you could make clear which policy your comment relates to.
GHR1 Energy efficiency: The Council welcomes the approaches set out within Policy GHR1, which align with the Council’s views on energy efficiency standards. The policy has a clearer focus on achieving real on-site carbon and energy reductions, rather than relying on carbon offset payments to meet target shortfalls.
GHR2 Low-cost low-carbon heat: The borough supports the aims of this policy, which recognises new and emerging evidence on the best way to decarbonise the heat network. The simplification of the assessment process is welcome.
GHR3 Whole life-cycle carbon: This policy has been carried forward from the existing London Plan, with amendments to include a requirement for additional evidence around the approach to the assessment and reduction of embodied carbon emissions. The Council already sets out a similar approach within the Bexley Local Plan and furthermore welcomes the introduction of minimum targets. Therefore, there is no objection to this specific policy.
GHR7 Green infrastructure and Urban Greening Factor: The Council already identifies green infrastructure assets and relevant opportunities that address environmental and social challenges within the Bexley Local Plan and its associated supporting documents. Policy GHR7 builds upon the requirements within Policy G5 Urban Greening within the current London Plan. The draft policy includes a target for industrial uses. This is an approach that aligns with the Bexley Local Plan, which requires that levels of urban greening on industrial sites be demonstrated.
GHR10: Air quality: the Council welcomes the overall aim of Policy GHR10 to improve local air quality, reduce people's exposure to air pollution, and help create a cleaner, healthier environment for everyone who lives, works, or visits Greater London.
Chapter 6: Place visions and place-based approaches
The focus of the Council’s response to this chapter is the need to clarify the draft London Plan’s identification of Bexley’s Green Belt as a sustainable location for growth. This is particularly with regard to land at Sidcup and Bexley (BLG78) being indicatively identified as a ‘Green Belt Future Candidate for Residential-led Mixed Use,’ and land within Bexley’s Green Belt (BLG70) appearing to be identified to accommodate the displacement of designated industrial land within other London boroughs for the purposes of supporting housing growth.
PV1: Brownfield First Opportunity Areas
6 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
Yes
7 Answer Q7 only if you have chosen No for Q6. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
N/A
8 If you have answered ‘don’t know’ and want to explain why, please do so.
N/A
PV2: Central Activities Zone
9 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
Don’t know
10 Answer Q10 only if you have chosen No for Q9. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
N/A
11 If you have answered ‘don’t know’ and want to explain why, please do so.
There are no identified Central Activities Zones (CAZ) within the London Borough of Bexley, which maintains the current position. As such, any requirements of this policy would not apply within the borough at this time (policy PV2 only applies to all development in CAZ and NIOD, which would be located specifically within CAZ or NIOD).
PV3: Town centres and high streets
12 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
Don’t know
13 Answer Q13 only if you have chosen No for Q12. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
N/A
14 If you have answered ‘don’t know’ and want to explain why, please do so.
The Council is concerned about the strong focus of housing intensification within all town centres, as some town centres will simply not be able to support this. Plan-making and development management policy A(3) is a particular concern, particularly in the wording “housing-led intensification,” and the appropriateness of this is questioned. The Council agrees that, where possible, town centres should support housing delivery, however this should not be at the detriment of typical town centre uses, which should remain the focus of town centres.
The London Plan should not support a blanket approach to developing town centres across a city with such varied contexts. This is especially important in contexts such as Bexley where the Council has introduced an Article 4 Direction to control the change of Class E uses to residential in the borough’s town centres.
Similarly, there is concern that A(8)(i) focuses too much on housing provision at the detriment of existing leisure uses, placing increased strain on leisure and employment infrastructure (which is necessary alongside homes).
In terms of A(8)(ii) the draft policy supports the redevelopment of existing low-density edge-of-centre and out-of-centre retail and leisure parks (where these are located outside of SIL and LSIS) for the provision of new capacity for industrial and distribution uses, which includes micro logistics. The Council would comment that whilst such facilities should more ideally be located within existing SIL and LSIS, that where this type of development would result in the provision of industrial and distribution uses on land that isn't Green Belt, then this approach would be appropriate.
Regarding part E of the draft policy (specifically the requirement for plan-making authorities to designate street and covered markets on their Policies Maps), can it be clarified, beyond the extent of paragraph 6.24 of the policy implementation text, which markets this requirement would actually apply to. Many markets operate on a weekly, bi-weekly, or monthly function. Is it the intention that these be specifically included, or is it just permanent markets?
PV4: Strategic economic clusters and corridors
15 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
Don’t know
16 Answer Q16 only if you have chosen No for Q15. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
N/A
17 If you have answered ‘don’t know’ and want to explain why, please do so.
There are no Strategic economic clusters identified within LB Bexley, per Table 6.1 and the economy key diagram, which maintains the current position.
Given part B of draft policy PV4 and its emphasis on the supporting of growth of wider economic corridors, the Council notes however that Figure 4.1 - Economy sub key diagram requires amendments for accuracy. As provided, the diagram does not represent the Thames Estuary Production Corridor as passing through all relevant boroughs, including Bexley, and the same diagram identifies BFOA30 (Bexley Riverside) however this is missing from the accompanying key.
PV5: Industrial land supporting housing growth
18 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
No
19 Answer Q19 only if you have chosen No for Q18. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
Whilst specifically relating to industrial land supporting housing growth (for which the London Borough of Bexley has not been identified, the draft policy directly affects Bexley as a location within the borough - which is currently designated as Green Belt - has been identified to accommodate industrial growth, seemingly to offset the either the proposed release, or displacement of existing designated industrial land elsewhere within London (out of borough) to meet residential need. Whilst it is likely that this release is within the same primary market area (PMA) as Bexley, this is not explicit within the draft Plan.
Table C2 (Annex C) is the industrial green belt BLG reference table. This table indicates that the locations identified are those that are to help meet additional need for storage and distribution. For Bexley, BLG70 is identified, with the reference name being M20 (Swanley Area). The Council would suggest that this land is not required for such purposes, given the level of vacant industrial land within the borough. And that due to such vacancy, the development of Green Belt to meet the need is not necessary.
In terms of reasonable alternatives, it is unclear why both the modernisation, and more importantly intensification of existing designated industrial land has not been considered in greater depth prior to identifying the areas for accommodating major industrial growth that are outlined on Figure 6.5 (which identifies the specific junctions with a suitable section of the strategic road network to have adequate capacity and flow rates to accommodate major industrial growth).
The proposed requirements (to meet need for storage and distribution) are linked to the findings of the Greater London Authority Economic and Infrastructure Supply and Demand Study (EISDS) produced by Arup and Nexus Analytics & Research, dated July 2026. The key points from the study, which relate to London Borough of Bexley are as below.
Table 13.1 of the EISDS states that Bexley had 50.58 hectares of vacant industrial land in 2025, which represents 21% of vacant industrial land in London (% of London total). The preamble to this Table highlights that Bexley is one of four boroughs that can accommodate most of the land supply.
Table 13.3 covers the adjustment to vacant industrial land across London geographies to account for “other uses,” which are identified as open storage, self-storage and other uses that depend on industrial land including infrastructure uses such as utilities, rail land, waste management and recycling. It is noted that there is no quantitative assessment of these uses, but that they need to be accounted for when estimating the amount of vacant industrial land that could be used for the uses which have been analysed quantitatively within the EISDS study.
As a result of this, the figures for vacant industrial land have been adjusted and based on assumptions that the current position of industrial land occupied by “other uses” remains broadly constant over the assessment period. This has adjusted vacant industrial land in Bexley to 34.38 hectares.
Table 8.6 of the EISDS highlights the projected new storage and distribution need in hectares by borough and by PMA for 2024-2050. The projected need for Bexley is 30 hectares. Table 8.3 indicates the projected new floor space demand in square metres by geography, under high efficiency assumptions for 2024-2050 of 167,000m2 in Bexley.
Therefore, if 30 hectares of industrial land is required under the high efficiency assumptions to create 167,000m2 of new floor space, then this can be met within Bexley’s existing designated industrial land with a surplus of 4.38 hectares of vacant land that would still remain for other appropriate uses.
On this basis, the Greater London Authority’s own evidence does not appear to reflect a need to develop within the Green Belt at BLG70 (to provide for additional storage and distribution capacity) to enable the offsetting of industrial land lost elsewhere to support housing growth. The current level of vacant designated industrial land in Bexley, which is already located within brownfield, accessible locations, can be utilised for the assumptions that have been made regarding demand.
Indeed, the Bexley Riverside BFOA is identified in Annex E as one of the capital’s largest concentrations of industrial land and that “growth should be guided by employment-led regeneration, with a focus on intensifying industrial land, and unlocking strategic sites for long-term productivity.” The Council would therefore challenge the assumption that BLG70 is necessary.
Please see the Council’s full response to policy MBUL1, GLE2 and PV7 as these directly relate to the response to policy PV5.
20 If you have answered ‘don’t know’ and want to explain why, please do so.
N/A
PV6: Metropolitan Open Land
21 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
No
22 Answer Q22 only if you have chosen No for Q21. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
The Council welcomes the distinction of Metropolitan Open Land (MOL) being made, and how this land use designation differs from that of the Green Belt (in the case of London, the Metropolitan Green Belt.
The Council would note that policy PV6 (which is to be applied to MOL) as drafted does not relate to the NPPF as had previously been the case within the current London Plan. This difference in approach is with specific regard to the national policy tests being applied for inappropriate development (that being the assessment of very special circumstances) as current London Plan policy G3 states that MOL is afforded the same status and protection as Green Belt.
Draft policy PV6 however continues to reference 'very special circumstances' under parts A and F of the policy. The term 'very special circumstances' has an extremely specific meaning within planning in terms of the assessment of inappropriate development within the Green Belt. If the direct link to weighting in terms of the status to be afforded to MOL is to be severed from that of the assessment of development in the Green Belt as implied (and given the fact that there is no mention of the NPPF within the draft policy), then 'very special circumstances' and what this means for MOL development need to be defined within the glossary of the London Plan. At present, this is not the case.
With regard to part G (1) of the draft policy, development in the MOL is identified to be considered as appropriate where it is minor development, or development involving previously developed land only (above ground structures), and is beneficial to the strategic function of the MOL set out in part C (1) i and ii. The Council would comment here that 'minor' development is specific in terms of application type within the planning system. Minor forms of development can vary, and thus this should be either discussed within the policy implementation text or defined within the glossary.
23 If you have answered ‘don’t know’ and want to explain why, please do so.
N/A
PV7: Sustainable development and enhancement of the Green Belt
24 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
Don’t know
25 Answer Q25 only if you have chosen No for Q24. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
N/A
26 If you have answered ‘don’t know’ and want to explain why, please do so.
The Council would highlight that no Bexley railway stations have been identified within Figure 6.4 as being suitable to accommodate major residential growth (there are no well-connected railway stations within the borough on the map). As such, there are no locations identified for major proposals in the borough for residential-led proposals as the requirements of Box PV7A (Green Belt sustainable locations) could not be met (the requirements are specified in part D(2) of draft policy PV7.
This clearly being the case, per Figure 6.4, the Council does not consider that the identification of BLG78 (Sidcup and Bexley) is identified on the 20 Year Key Diagram as a 'Green Belt Future Candidate for Residential-led Mixed Use’ is appropriate. Whilst it is noted that the term 'indicative' is included within the description of Figure 2.2, when there are no stations identified on Figure 6.4 that would support this or any prospect of existing stations being improved sufficiently to meet the required standard . As such, this location would likely fail against draft policy PV7 as the requirements of Box PV7A would need to be addressed. With there being no train stations identified on Figure 6.4, the test will fall to a location being within 400m of a bus route that then subsequently needs to meet the criteria of Box PV7C. This appears to be quite a test.
With regard to part B(1) of the draft policy, for the reasons which are fully explained within the Council’s response to draft policies GLE2 and PV5, the Council would not consider that there would be strategic exceptional circumstances that would justify strategic scale releases of Green Belt land within the borough to deliver industrial-led schemes (as industrial capacity can be provided for within the borough's existing vacant industrial land which is already designated). On this basis, the council would argue that part D (1) of the policy cannot be met for proposed BLG 70 as it would be argued that there is no strategic need for the type of development proposed as it can be met elsewhere (with elsewhere being on existing vacant industrial land).
Paragraph 6.53 of the policy implementation text states that development within BLGs is expected to contribute to cohesive urban extensions. Given the rough location of BLG70, and the Greater London Authority’s own evidence that is contained within the London Green Belt Assessment (prepared for the Greater London Authority by LUC, dated May 2026), it is not considered that the release of this site from the Green Belt would contribute to a ‘cohesive urban extension.’ As the evidence paper states at paragraph 3.70, and taking into account the parcels that occupy the rough area where BLG70 is proposed to be located, this area of land is considered to make a strong contribution to Purpose A (checking unrestricted sprawl of large built-up area), having a strong sense of separation form the urban edge.
Paragraph 3.70 states that development in these locations would expand the large built up area into the open countryside, often breaching retaining physical features in reasonable proximity to the urban edges. This would therefore have a notable incongruous impact on the urban pattern. Similarly, the parcels roughly where BLG70 is proposed also contribute strongly to Purpose B (preventing towns merging into one another) and Purpose C (protecting the countryside from encroachment) where it was found that if development were to take place in the location, that the surrounding Green Belt would be subject to a stronger urbanising influence than is currently the case.
The conclusions of the study indicate that the parcels to which BLG70 would likely apply remain Green Belt (they would not be considered to be potentially suitable for definition as grey belt land in the borough). On this basis, it is not considered, in line with the Greater London Authority’s own evidence, that the release of land within the Green Belt around the area where BLG70 is located could ever be considered to contribute to a ‘cohesive urban extension.’ The evidence itself refutes that.
Please see the Council’s full response to policy MBUL1, GLE2 and PV5 as these directly relate to the response to policy PV7.
PV8: Strategic and local views
27 Do you consider that, in overall terms, the policy identified within the draft London Plan is sound, having regard to the four tests of soundness?
Don’t know
28 Answer Q28 only if you have chosen No for Q27. In particular, please provide reasons for your response and identify any specific areas where you consider the Plan may fail to meet any of the four tests of soundness.
N/A
29 If you have answered ‘don’t know’ and want to explain why, please do so.
The London View Management Framework (LVMF) is yet to be published. This policy directly relates to the LVMF, and the Management Plans which are to be included within that document. Further comments from the Council are likely to be returned upon the publication of the LVMF, depending on consultation timeframes.
Examination in public
30 If you are seeking any modification to the draft Plan, please confirm whether you would wish to appear at the Examination in Public, if requested to do so by the Inspector. If so, we will pass your details to the Inspector who will decide whether to issue a formal invitation to you at a later date. The Inspectors themselves would set the dates that the hearing would be held.
Yes
No
31 Answer Q31 only if you have chosen Yes to Q30. Please explain why you consider it necessary for you to attend the Examination in Public.
The Council raises concerns for some policies in this chapter as to whether they meet the ‘test of soundness’ (e.g. positively prepared, justified, effective and consistent with policies published within the revised National Planning Policy Framework).
General comments
32 If you have any general comments about any of the policies in this chapter, please record them here. Where you have a comment about a specific policy, it would help us if you could make clear which policy your comment relates to.
The report summary of the London Plan Green Belt Strategic Approach London Plan Evidence Paper (July 2026) states that ‘[t]his report has set out the case for, and proposed approach to, the selective release of Green Belt land through the new London Plan’ (paragraph 6.1). The Council would make clear that it is not for the London Plan to release Green Belt. In the event of any such release, this is a matter which is dealt with a Local Plan level, and not through the London Plan.
Omission at Figure 6.1: the Places sub key diagram requires amendments for accuracy. As provided, the marker for BFOA30 (Bexley Riverside) is missing from the diagram, which also does not represent the Thames Estuary Production Corridor as passing through all relevant boroughs, including Bexley.
Annexes
Annex C
Table C1 (well-connected train stations within Green Belt residential BLGs) includes no stations in Bexley, even though Sidcup and Bexley (future BLG78) is identified and ‘safeguarded’ within the 20-year key diagram. There is no evidence justifying how Bexley Station (as this would be the station within the future BLG) could be substantially improved within the time period to allow this future BLG to come forward
Table C2 (industrial Green Belt BLG reference table) includes the M20 (Swanley area) industrial BLG70 (within both Bexley and Bromley) and the Council challenges its inclusion given that Bexley has enough vacant industrial land within designated industrial locations to meet its requirement for additional storage and distribution facilities.
Table C3 (junctions of the strategic road network best placed to accommodate industrial growth within the Green Belt BLGs) has identified BLG64, which is from junction 3 of the M25 to the Sidcup bypass (the A20 and its slip road). The Council considers this not to be justified as there is no evidence that this junction is capable of taking the additional growth. Further to this, the Sevenoaks District Local Plan, which has just completed its Regulation 19 public consultation, proposes release of Green Belt sites adjacent to the Greater London boundary at the London Boroughs of Bexley and Bromley. This will add congestion to this already stretched junction. Indeed, Kent County Council has raised concerns with the capacity of the transport network in this location.
Annex D
Table D1, which does not list a single major transport intervention in Bexley. The omission of references to critical public transport infrastructure improvements in Bexley is considered a startling oversight and significant missed opportunity within the draft Plan to realise a large quantum of sustainable and inclusive growth in Bexley Riverside. The DLR extension to Thamesmead now does not reference a future extension to Belvedere Station and the current safeguarding for Crossrail to Hoo Junction is not identified anywhere in the draft Plan, even though the safeguarding legislation is still in place.